INSP - Final | 4/30/1998 | 5/1/1998 | 5/1/1998 | P | PASS |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [3313669].
|
INSP - Letter of compliance | 5/1/1998 | 5/1/1998 | 5/1/1998 | P | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14346 This was done 5/1/98 I had toadd in later.
|
INSP - Letter of compliance | 5/1/1998 | 5/1/1998 | 5/1/1998 | P | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14346 This was done 5/1/98 I had toadd in later.
|
INSP - Final | 4/30/1998 | 4/30/1998 | 4/30/1998 | P | FAIL |
Russ Owen
|
|
|
04/30/98 407 - left corrections.
|
INSP - Energy code compliance | 4/6/1998 | 4/6/1998 | 4/6/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 -
|
INSP - Framing/Rough-in | 4/3/1998 | 4/6/1998 | 4/6/1998 | A | PASS |
Russ Owen
|
|
|
04/06/98 407 - BILL ###-#### ì
|
INSP - Framing/Rough-in | 4/2/1998 | 4/2/1998 | 4/3/1998 | P | FAIL |
Russ Owen
|
|
|
04/02/98 407 - left corrections.
|
INSP - Framing/Rough-in | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | PART |
Russ Owen
|
|
|
will add some additional fasteners to garage wing wall.
|
INSP - Framing/Rough-in | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | CANC |
Jim Storey
|
|
|
03/12/98 301 - reinspection bill ###-####
|
INSP - Framing/Rough-in | 3/10/1998 | 3/10/1998 | 3/11/1998 | P | NR |
Russ Owen
|
|
|
03/10/98 407 - sheer wall inspection, This is not ready I left a correct
|
INSP - Foundation | 2/10/1998 | 2/11/1998 | 2/11/1998 | A | PART |
Russ Owen
|
|
|
pored before inspection,no approved plans on site,Set backs ok. backs ok
|