Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-00217
StatusFinaled
Name STETSON HOMES INC
Site Address 6069 S SWEET GUM WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2206 sq. ft. two story single family dwelling with a 715 sq. ft. attached three car garage and 144 sq. ft. concrete patio per approved plans and attached requirement lists. (1st floor 1400 sq. ft.) (2nd floor 806 sq. ft.) Note: legal paved access required before final. ACHD #98-0217 PC #075 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/14/19989/15/19989/15/1998APASS
DetailsRuss Owen
09/15/98 407 - JOHN ###-####
INSP - Letter of compliance9/15/19989/15/19989/15/1998 PASS
DetailsRuss Owen
/ / 407 - LC#15940.NOTE under floor is being dried out due to sprinkle with Stan at Stetson.
INSP - Letter of compliance9/15/19989/15/19989/15/1998 PASS
DetailsRuss Owen
/ / 407 - LC#15940.NOTE under floor is being dried out due to sprinkle with Stan at Stetson.
INSP - Letter of compliance9/15/19989/15/19989/15/1998 PASS
DetailsRuss Owen
/ / 407 - LC#15940.NOTE under floor is being dried out due to sprinkle with Stan at Stetson.
INSP - Letter of compliance9/15/19989/15/19989/15/1998 PASS
DetailsRuss Owen
/ / 407 - LC#15940.NOTE under floor is being dried out due to sprinkle with Stan at Stetson.
INSP - Final9/8/19989/9/19989/9/1998PFAIL
DetailsRuss Owen
09/09/98 407 - still has corrections
INSP - Final9/4/19989/8/19989/9/1998ANR
DetailsRuss Owen
09/09/98 407 - talked with builder still drying out crawl space due to s
INSP - Final9/3/19989/4/19989/4/1998PNR
DetailsWes Worcester
09/04/98 342 - addressed on sweet gum???? [9397530].
INSP - Final9/2/19989/3/19989/4/1998AFAIL
DetailsJim Storey
09/03/98 301 - ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Final9/2/19989/2/19989/2/1998 NR
DetailsRuss Owen
09/02/98 407 - need electrical aand plumbing final before structural.
INSP - Final8/21/19988/21/19988/21/1998PCANC
DetailsRuss Owen
SHELLY ###-####
INSP - Framing/Rough-in3/24/19983/24/19983/24/1998PPASS
DetailsRuss Owen
03/24/98 407 - repairs as per truss joist micmillian.
INSP - Energy code compliance3/23/19983/23/19983/24/1998PPART
DetailsRuss Owen
03/23/98 407 - need to have the framing approved before sheetrock.
INSP - Framing/Rough-in3/23/19983/23/19983/23/1998PFAIL
DetailsRuss Owen
03/23/98 407 - need to correct the rear 2 beams.
INSP - Framing/Rough-in3/19/19983/20/19983/23/1998ANR
DetailsRuss Owen
03/20/98 407 - not ready need electrical, I have done a walk thru with t noted items.
INSP - Framing/Rough-in3/18/19983/19/19983/19/1998ANR
DetailsRuss Owen
03/19/98 407 - need al other inspections except plumbing.
INSP - Framing/Rough-in3/16/19983/16/19983/17/1998PPART
DetailsRuss Owen
03/16/98 407 - pre inspection only. done at there request.
INSP - Concrete2/11/19982/12/19982/12/1998APART
DetailsRuss Owen
02/12/98 407 - poured before insp no approved plans checked set backs on