Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD98-00218
StatusFinaled
Name MIKE MARRS
Site Address 6093 E GATEWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
TO BUILD A 2982 SF TWO STORY SFD ( 1482 SF 1ST FL; 1500 SF 2ND FL.) WITH AN 1197 SF UNFINISHED BASEMENT AREA AND A 759 SF ATTACHED THREE BAY GARAGE AND CONCRETE PATIO PER APPROVED PLANS AND ENGINEERING. ACHD# 98-0704, PC#064. 340CD.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final6/8/19986/9/19986/9/1998APASS
DetailsRuss Owen
06/09/98 407 - Scheduled by Hello!. Contact phone is [8666175].
INSP - Letter of compliance6/9/19986/9/19986/9/1998 PASS
DetailsRuss Owen
/ / 407 - LC#
INSP - Letter of compliance6/9/19986/9/19986/9/1998 PASS
DetailsRuss Owen
/ / 407 - LC#
INSP - Final6/5/19986/8/19986/8/1998APART
DetailsRuss Owen
06/08/98 407 - need electrical approval only.Contact phone is [8666175].
INSP - Energy code compliance4/8/19984/9/19984/9/1998APASS
DetailsRuss Owen
04/09/98 407 - Scheduled by Hello!. Contact phone is [8666175].
INSP - Framing/Rough-in4/9/19984/9/19984/9/1998 PASS
DetailsRuss Owen
/ / 407 - re-insp.
INSP - Framing/Rough-in4/6/19984/7/19984/7/1998AFAIL
DetailsRuss Owen
04/07/98 407 - left correction.
INSP - Framing/Rough-in4/5/19984/6/19984/6/1998ACANC
DetailsRuss Owen
04/06/98 407 - cancell need electrical.
INSP - Framing/Rough-in3/19/19983/20/19983/20/1998APART
DetailsRuss Owen
03/20/98 407 - ok to install finished sideing.Bob with Marrs will add a locations.
INSP - Concrete2/20/19982/23/19982/23/1998APART
DetailsRuss Owen
contractor has detailed a wider footing for basement walls,will be doweled with #4 bars. work is not finished at the time of inspection,dowels and contractor on site.
INSP - Foundation2/11/19982/12/19982/12/1998APART
DetailsRuss Owen
This foundation is not as per the engineers detail it was missed by the drafstman,Marrs has told me they will get a letter of approval from enginner to contruct foundation as drawn on the plans, which is still above our minimum requirements.
INSP - Foundation2/10/19982/10/19982/11/1998PPART
DetailsRuss Owen
this did not transfer to me on 02/10/98.footings have been poured before inspection,no approved plans on site,early start permit,talk with job supper about engineering,said engineer approved as per the plans on site,will get letter before framing inspection.