INSP - Final | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | PASS |
Russ Owen
|
|
|
06/09/98 407 - Scheduled by Hello!. Contact phone is [8666175].
|
INSP - Letter of compliance | 6/9/1998 | 6/9/1998 | 6/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#
|
INSP - Letter of compliance | 6/9/1998 | 6/9/1998 | 6/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#
|
INSP - Final | 6/5/1998 | 6/8/1998 | 6/8/1998 | A | PART |
Russ Owen
|
|
|
06/08/98 407 - need electrical approval only.Contact phone is [8666175].
|
INSP - Energy code compliance | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | PASS |
Russ Owen
|
|
|
04/09/98 407 - Scheduled by Hello!. Contact phone is [8666175].
|
INSP - Framing/Rough-in | 4/9/1998 | 4/9/1998 | 4/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-insp.
|
INSP - Framing/Rough-in | 4/6/1998 | 4/7/1998 | 4/7/1998 | A | FAIL |
Russ Owen
|
|
|
04/07/98 407 - left correction.
|
INSP - Framing/Rough-in | 4/5/1998 | 4/6/1998 | 4/6/1998 | A | CANC |
Russ Owen
|
|
|
04/06/98 407 - cancell need electrical.
|
INSP - Framing/Rough-in | 3/19/1998 | 3/20/1998 | 3/20/1998 | A | PART |
Russ Owen
|
|
|
03/20/98 407 - ok to install finished sideing.Bob with Marrs will add a locations.
|
INSP - Concrete | 2/20/1998 | 2/23/1998 | 2/23/1998 | A | PART |
Russ Owen
|
|
|
contractor has detailed a wider footing for basement walls,will be doweled with #4 bars. work is not finished at the time of inspection,dowels and contractor on site.
|
INSP - Foundation | 2/11/1998 | 2/12/1998 | 2/12/1998 | A | PART |
Russ Owen
|
|
|
This foundation is not as per the engineers detail it was missed by the drafstman,Marrs has told me they will get a letter of approval from enginner to contruct foundation as drawn on the plans, which is still above our minimum requirements.
|
INSP - Foundation | 2/10/1998 | 2/10/1998 | 2/11/1998 | P | PART |
Russ Owen
|
|
|
this did not transfer to me on 02/10/98.footings have been poured before inspection,no approved plans on site,early start permit,talk with job supper about engineering,said engineer approved as per the plans on site,will get letter before framing inspection.
|