INSP - Final | 6/23/1998 | 6/23/1998 | 6/23/1998 | P | PASS |
Russ Owen
|
|
|
final ok as per 407
|
INSP - Final | 6/22/1998 | 6/23/1998 | 6/23/1998 | A | FAIL |
Russ Owen
|
|
|
06/23/98 407 - left corrections.
|
INSP - Framing/Rough-in | 4/24/1998 | 4/24/1998 | 4/24/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-insp,engineer has approved 2 misslocated hold downs.
|
INSP - Energy code compliance | 4/17/1998 | 4/17/1998 | 4/17/1998 | P | PASS |
Russ Owen
|
|
|
04/17/98 407 - ###-####/GARY - INSULATION INSPECTION
|
INSP - Framing/Rough-in | 4/17/1998 | 4/17/1998 | 4/17/1998 | P | PASS |
Russ Owen
|
|
|
04/17/98 407 - still has a correction,need to get something from enginee hold downs.
|
INSP - Framing/Rough-in | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | FAIL |
Russ Owen
|
|
|
04/15/98 407 - left corrections.04
|
INSP - Framing/Rough-in | 4/6/1998 | 4/7/1998 | 4/7/1998 | A | PART |
Russ Owen
|
|
|
nailing ###-#### ,nailing ok contractor gary on site,2 hold downs at the rear are mis-placed,gary will have the engineer address.
|
INSP - Foundation | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PASS |
Russ Owen
|
|
|
03/17/98 407 - need to install the hold downs ,contractor said he will h
|
INSP - Foundation | 3/13/1998 | 3/16/1998 | 3/16/1998 | A | PASS |
Russ Owen
|
|
|
03/16/98 407 - footings ok will need to hold the right side foundation wall in tight to maintain the 5 foot set backs told the concrete contactor and builder at footing inspection. The plot plan is only 5 foot on each side.
|