INSP - Final | 5/22/1998 | 5/26/1998 | 5/26/1998 | A | PASS |
Russ Owen
|
|
|
05/26/98 407 - Scheduled by Hello!. Contact phone is [3713785].
|
INSP - Letter of compliance | 5/26/1998 | 5/26/1998 | 5/26/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14345
|
INSP - Letter of compliance | 5/26/1998 | 5/26/1998 | 5/26/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14345
|
INSP - Framing/Rough-in | 3/26/1998 | 3/27/1998 | 3/27/1998 | A | PART |
Russ Owen
|
|
|
03/27/98 407 - called and talked with steve from varrial,The truss company is going out to job to modify truss to a 2 point bearing eliminating the center bearing caled for on the detail,Framing ok Butis subject to approval from truss company.
|
INSP - Framing/Rough-in | 3/26/1998 | 3/26/1998 | 3/26/1998 | P | PART |
Russ Owen
|
|
|
03/26/98 407 - Still need to address a 3 point bearing truss,called cont to call me back.Also talkedwith trus company are working on it.
|
INSP - Energy code compliance | 3/25/1998 | 3/25/1998 | 3/25/1998 | P | FAIL |
Russ Owen
|
|
|
03/25/98 407 - still have corrections that need to be made called and ta
|
INSP - Energy code compliance | 3/23/1998 | 3/24/1998 | 3/24/1998 | P | CANC |
Russ Owen
|
|
|
03/24/98 407 - cancelled by contractor.
|
INSP - Framing/Rough-in | 3/19/1998 | 3/20/1998 | 3/20/1998 | A | FAIL |
Russ Owen
|
|
|
03/20/98 407 - left correctionslo!.
|
INSP - Footings | 2/3/1998 | 2/4/1998 | 2/5/1998 | A | PASS |
Russ Owen
|
|
|
02/04/98 407 - exterior footings and set backs ok. the city approved pla just a working set.
|