Permanent Occupancy | | 6/10/1998 | 6/10/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/5/1998 | 6/5/1998 | 6/5/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP - Final | 4/29/1998 | 4/30/1998 | 4/30/1998 | P | PART |
Wes Worcester
|
|
|
04/30/98 342 - AROUND 4:00 AS PER WES JAY ###-####
|
INSP-Final Inspection | 4/30/1998 | 4/30/1998 | 4/30/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved. awaiting standpipe test certification
|
INSP - Framing/Rough-in | 4/24/1998 | 4/27/1998 | 4/27/1998 | A | PASS |
Wes Worcester
|
|
|
04/27/98 342 - TWO HOUR WALL INSP\8:30 ###-#### HE SAYS YOU SET THIS TIM
|
INSP-Alarm Testing | 4/24/1998 | 4/27/1998 | 4/27/1998 | P | FAIL |
Rick Jackson
|
|
|
arround 2 please call jim dorsey ###-#### people on job alarms tested and passed. recheck security doors for emergency use. install smoke for alarm panel in electrical room. provide access to dampers and verify operation.
|
INSP - Framing/Rough-in | 4/16/1998 | 4/16/1998 | 4/16/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - wall cover in am
|
INSP - Wall cover | 4/15/1998 | 4/16/1998 | 4/16/1998 | P | PART |
Wes Worcester
|
|
|
04/15/98 342 - jay ###-####-2 hr wall
|
INSP - Framing/Rough-in | 4/10/1998 | 4/13/1998 | 4/13/1998 | A | NH |
Wes Worcester
|
|
|
04/12/98 342 - sears ###-#### jay
|
INSP - Framing/Rough-in | 4/13/1998 | 4/13/1998 | 4/13/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - still has outstanding items from previous c/n
|
INSP-Conference | 3/25/1998 | 3/25/1998 | 3/25/1998 | P | PART |
Rick Jackson
|
|
|
requested alarm plans, checked standpipes in exits and stairwells.
|
INSP-Conference | 3/23/1998 | 3/25/1998 | 3/25/1998 | P | PART |
Wes Worcester
|
|
|
03/24/98 342 - 4TH FLOOR JAY ###-####-AROUND IF POSSIBLE 2:00
|
INSP - Framing/Rough-in | 3/19/1998 | 3/20/1998 | 3/20/1998 | A | PART |
Wes Worcester
|
|
|
03/20/98 342 - 1st layer ok 4TH FLOOR SEARS-MK PLAZA II-JAY - ###-####
|
INSP - Framing/Rough-in | 3/16/1998 | 3/16/1998 | 3/16/1998 | P | FAIL |
Wes Worcester
|
|
|
03/16/98 342 - MK PLAZA 11--2 hr wall wrong... need details--SEARS--JAY
|
INSP - Framing/Rough-in | 3/16/1998 | 3/16/1998 | 3/16/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - partial ok, 2 hr wall wrong and need detail for 90 min jambs specs in addition to previous details requested
|