INSP - Final | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | CANC |
Tom Arcoraci
|
|
|
LARRY/PAGER ###-#### - KEY IS UNDERNEATH THE HOUSE #'S ABOVE THE GARAGE DOOR HEADER IF IT'S NOT UNLOCKED DONE ON 5-04-98 408
|
INSP - Final | 4/30/1998 | 5/4/1998 | 5/4/1998 | A | CANC |
Tom Arcoraci
|
|
|
key under house numbers ###-#### DONE
|
INSP - Final | 5/4/1998 | 5/4/1998 | 5/4/1998 | | PASS |
Tom Arcoraci
|
|
|
05/04/98 408 - key under house numbers ###-####
|
INSP - Framing/Rough-in | 4/21/1998 | 4/22/1998 | 4/22/1998 | A | CANC |
Tom Arcoraci
|
|
|
04/22/98 408 - ###-####/LARRY - FRAMING INSP.
|
INSP - Energy code compliance | 4/2/1998 | 4/2/1998 | 4/2/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 3/31/1998 | 4/1/1998 | 3/31/1998 | P | PASS |
Jim Sly
|
|
|
04/01/98 316 -
|
INSP - Framing/Rough-in | 3/23/1998 | 3/24/1998 | 3/24/1998 | P | FAIL |
Jim Sly
|
|
|
03/24/98 316 - C/N....Provide engineering for shear at rear wall....
|
INSP - Framing/Rough-in | 3/11/1998 | 3/11/1998 | 3/11/1998 | | PART |
Tom Arcoraci
|
|
|
03/11/98 408 - sheer wall inspection larry ###-#### shear wall nailing ok hold downs installed
|
INSP - Foundation | 2/9/1998 | 2/10/1998 | 2/10/1998 | A | CANC |
Tom Arcoraci
|
|
|
02/10/98 408 - JERRY ###-####
|