BLD-Other | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | DONE |
Bob Archibald
|
|
|
1 hour addmin fee ($46.31) for each trade to request final inspections
|
INSP - Framing/Rough-in | 3/11/1998 | 3/11/1998 | 3/11/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/10/1998 | P | PART |
Jim Storey
|
|
|
03/10/98 301 - TIM WILL BE THERE--NO PHONE #
|
INSP - Framing/Rough-in | 3/5/1998 | 3/6/1998 | 3/6/1998 | P | NH |
Jim Storey
|
|
|
03/06/98 301 - TIM ###-#### UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Framing/Rough-in | 3/4/1998 | 3/5/1998 | 3/5/1998 | P | CANC |
Jim Storey
|
|
|
03/04/98 301 - CANCLED BY CONTRACTOR THRU DIXI
|