INSP - Final | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
|
|
|
RAY ###-#### made ok for occ req card l/c made ok did not issue same as the occ req card had not been signed and there were no corrections on site. Card was delivered by me to the office 01/25/99 and the signoffs were confirmed.
|
INSP-Final Inspection | 1/21/1999 | 1/22/1999 | 1/22/1999 | A | FAIL |
Rick Jackson
|
|
|
01/22/99 409 - RAY ###-#### exit not installed; main exit hardware
|
INSP-Final Inspection | 1/22/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
|
|
|
ok by perry
|
Permanent Occupancy | | 1/22/1999 | 1/22/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/21/1999 | 1/21/1999 | 1/21/1999 | P | FAIL |
Rick Jackson
|
|
|
exit door hardware; exit sign by door 715
|
INSP - Framing/Rough-in | 10/19/1998 | 10/19/1998 | 10/19/1998 | | FAIL |
|
|
|
/ / 333 - called Dan and rejected duct and duct wrap submittal
|
INSP - Framing/Rough-in | 10/15/1998 | 10/16/1998 | 10/16/1998 | A | PASS |
|
|
|
10/16/98 333 - ray ###-#### FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PART |
|
|
|
10/13/98 333 - talked to contractor about 3m fire wrap
|
INSP - Framing/Rough-in | 10/2/1998 | 10/12/1998 | 10/12/1998 | A | PART |
|
|
|
10/13/98 333 - shaft requirements reviewed
|
INSP - Framing/Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | A | PART |
|
|
|
conference
|
INSP-Sprinkler Rough-in/Hydro | 9/29/1998 | 9/29/1998 | 9/29/1998 | P | PASS |
Rick Jackson
|
|
|
okay to cover
|
INSP - Framing/Rough-in | 7/9/1998 | 7/9/1998 | 7/9/1998 | P | PASS |
|
|
|
07/09/98 333 - FRAM-OK FRAMING
|