Permit Information
Permit NumberBLD98-00665
StatusFinaled
Name RALPH HADLEY
Site Address 1226 W RIVER ST
Project NameHUMPHREYS DIABETES
Customer Number 
ePlanReviewNo
Description
HUMPHREYS DIABETES CENTER * TO CONSTRUCT A 9,000 SQ.FT. BUILDING. THE WORK INCLUDES UTILITIES, SITE WORK, LANDSCAPE AND TENANT IMPROVEMENT. ALL PER APPROVED PLANS. THE BUILDING IS SINGLE STORY V-N NON-SPRINKLED WITH WOOD FRAMED INTERIOR AND EXTERIOR WALLS. THE CORRIDORS ARE CONSIDERED AS INTERVENING ROOMS AND THEREFORE NEED NOT BE RATED ACCORDING TO MARLENE ON4/22/98 DRH98-0012 PC#156-98 JML
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/20/19994/21/19994/21/1999APASS
DetailsRick Jackson
###-####//FIRE & LIFE SAFETY occ approved
Permanent Occupancy 4/21/19994/21/1999 DONE
Details
INSP - Final2/16/19992/16/19992/16/1999 PART
Details
02/12/99 338 - made ok for str. need P/W & CDHD signoffs
INSP-Final Inspection2/10/19992/12/19992/12/1999APART
DetailsRick Jackson
02/12/99 409 - bob ###-#### repair fire panel; remote indicators for duct detectors; knox box
INSP-Final Inspection1/15/19991/19/19991/19/1999APART
DetailsRick Jackson
01/19/99 409 - sprinkler hydro only - not a final. hydro pass
INSP-Final Inspection1/14/19991/15/19991/15/1999ANR
DetailsRick Jackson
mike- ###-#### pager # fn insp backflow preventor problems - will call for rehydro of underground and overhead piping
INSP - Framing/Rough-in12/16/199812/16/199812/16/1998PPASS
Details
12/16/98 333 - ###-#### FR- BOB- FIRE WALL INSP ok
INSP-Supply line flush11/12/199811/12/199812/12/1998PPASS
DetailsMike Kinnear
MIKE ###-####
INSP - Framing/Rough-in11/13/199811/16/199811/16/1998APASS
Details
11/16/98 333 - FRAM-OK FRAMING
INSP-Sprinkler Rough-in/Hydro11/16/199811/16/199811/16/1998APART
DetailsRick Jackson
overhead and high ceiling areas checked - okay to cover restrooms. identified inspectors test to be in an accessible location (not above ceiling)
INSP - Framing/Rough-in11/12/199811/13/199811/13/1998PFAIL
Details
11/13/98 333 - elec not passed
INSP-Sprinkler Rough-in/Hydro11/12/199811/12/199811/12/1998PFAIL
DetailsMike Kinnear
Outside East canopy rouph-in for cover inspection had one sprinkler more than 6" below roof deck. Instructed fitter on raising same. Walked through and found blind spots of coverage due to roof ducts and possible underspacing in electrical room if sheetrocked to roof! Inspectors test valve above the ceiling! Was told to lower it for easy access.
INSP-Sprinkler Rough-in/Hydro11/12/199811/12/199811/12/1998
Details
INSP-Sprinkler Rough-in/Hydro11/10/199811/10/199811/10/1998PPART
DetailsRick Jackson
okay to cover north and south exterior soffit
INSP - Framing/Rough-in11/6/199811/9/199811/9/1998APART
Details
11/09/98 333 - EXTERIOR WALLS OK ONLY
INSP - Framing/Rough-in10/22/199810/23/199810/23/1998APART
Details
10/23/98 333 - SHEAR WALL ok
INSP - Foundation8/27/19988/28/19988/28/1998A
Details
bob ###-####pager rebar