INSP - Final | 5/18/1998 | 5/19/1998 | 5/19/1998 | A | PASS |
Tom Arcoraci
|
|
|
05/19/98 408 - ###-####
|
INSP - Energy code compliance | 4/10/1998 | 4/16/1998 | 4/16/1998 | P | PASS |
Tom Arcoraci
|
|
|
04/16/98 408 - JOHN ###-####
|
INSP - Framing/Rough-in | 4/10/1998 | 4/16/1998 | 4/16/1998 | P | PASS |
Tom Arcoraci
|
|
|
04/16/98 408 - RE-FRAME ###-####
|
INSP - Framing/Rough-in | 4/10/1998 | 4/15/1998 | 4/15/1998 | P | FAIL |
Tom Arcoraci
|
|
|
04/15/98 408 - FRAMING ###-#### JOHN
|
INSP - Concrete | 3/23/1998 | 3/24/1998 | 3/24/1998 | A | PART |
Jim Sly
|
|
|
03/23/98 316 - Poured W/O..Soil, foot width, height OK..setbacks appear
|