INSP - Foundation | 7/13/1998 | 7/13/1998 | 7/13/1998 | | PASS |
|
|
|
Appears OK.
|
INSP - Final | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | PASS |
Russ Owen
|
|
|
07/09/98 407 - Grey ###-#### ì
|
INSP - Letter of compliance | 7/9/1998 | 7/9/1998 | 7/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14733,Letter on file in reguards to tempered window above
|
INSP - Letter of compliance | 7/9/1998 | 7/9/1998 | 7/9/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14733,Letter on file in reguards to tempered window above
|
INSP - Final | 7/7/1998 | 7/7/1998 | 7/7/1998 | P | FAIL |
Russ Owen
|
|
|
LATE PM PLEASE--GARAGE DOOR OPEN--DEBBIE ###-####
|
INSP - Framing/Rough-in | 5/7/1998 | 5/8/1998 | 5/8/1998 | A | PASS |
Russ Owen
|
|
|
05/08/98 407 - ###-#### reinspection of a reinspect
|
INSP - Energy code compliance | 5/5/1998 | 5/6/1998 | 5/6/1998 | P | PASS |
Russ Owen
|
|
|
05/06/98 407 - GREY/###-#### - INSULATION INSP.
|
INSP - Framing/Rough-in | 5/6/1998 | 5/6/1998 | 5/6/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - Re-inspection.
|
INSP - Framing/Rough-in | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | FAIL |
Russ Owen
|
|
|
05/01/98 407 - left corrections.
|
INSP - Framing/Rough-in | 4/29/1998 | 4/30/1998 | 4/30/1998 | A | PART |
Russ Owen
|
|
|
04/30/98 407 - partial insp only, exterior siding needs a few fasteners locations,contractor at the site will add them,ok to install finished si
|
INSP - Foundation | 4/6/1998 | 4/7/1998 | 4/7/1998 | A | PART |
Russ Owen
|
|
|
footing was poured before time of inspection,They areas per the plan at the site. But no Boise City approved plans are on site.also the set backs appear ok,They are well aware that the left side will need to be 5 foot minimum when they pour the walls. Walls not form up at this time.
|