BLD-Final | 12/19/2003 | 12/23/2003 | 12/23/2003 | A | PASS |
Jim Sly
|
|
|
Debbie ###-#### C/C issued. 12/23/2003 9:53:37 AM
|
BLD - Request for Extension | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Jim Sly
|
|
|
###-#### Debbie
|
BLD-Final | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | FAIL |
Jim Sly
|
|
|
###-#### Debbie C/N Landing door, Temp glass top of stair, Guards and handrails. address # s, remove paper facing ....found insul. 11/21/2003 9:14:16 AM
|
BLD - Request for Extension | 11/7/2003 | 11/7/2003 | 11/7/2003 | A | FAIL |
Jim Sly
|
|
|
###-#### Debra or ###-#### cell Talked to Deborah....told her that if she could get all the trade permits to final status that we would try to reopen her struct permit and get it finaled. 11/10/2003 9:07:19 AM
|
INSP - Framing/Rough-in | 11/24/1998 | 11/25/1998 | 11/25/1998 | A | PASS |
Tom Arcoraci
|
|
|
11/25/98 408 - Debbie, ###-#### - reinspect framing - late a.m.
|
INSP - Framing/Rough-in | 11/17/1998 | 11/18/1998 | 11/18/1998 | A | FAIL |
Tom Arcoraci
|
|
|
11/18/98 408 - DEBBIE...###-####
|
INSP - Framing/Rough-in | 11/16/1998 | 11/17/1998 | 11/17/1998 | A | NH |
Tom Arcoraci
|
|
|
11/17/98 408 - ###-#### OR ###-#### TO COVER
|
INSP-Conference | 10/2/1998 | 10/2/1998 | 10/2/1998 | | PASS |
Tom Arcoraci
|
|
|
10/02/98 408 - debbie ###-#### ok to side
|
INSP-Conference | 10/1/1998 | 10/2/1998 | 10/2/1998 | A | PASS |
Tom Arcoraci
|
|
|
10/02/98 408 - debbie ###-#### ok to side
|
INSP - Framing/Rough-in | 7/23/1998 | 7/24/1998 | 7/27/1998 | P | CANC |
Tom Arcoraci
|
|
|
07/24/98 408 - CONFERENCE W DRINKARD ###-#### WINDOW DIMENSIONS AREN'T WHAT WAS EXPECTED TO BE
|
INSP - Foundation | 4/6/1998 | 4/6/1998 | 4/6/1998 | P | PASS |
Tom Arcoraci
|
|
|
04/06/98 408 - footing/ ###-#### footing ok
|