INSP - Final | 7/29/1998 | 7/29/1998 | 7/29/1998 | P | PASS |
Jim Sly
|
|
|
07/29/98 316 - C/C # 015681
|
INSP - Letter of compliance | 7/29/1998 | 7/29/1998 | 7/29/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 015681
|
INSP - Letter of compliance | 7/29/1998 | 7/29/1998 | 7/29/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 015681
|
INSP - Energy code compliance | 6/16/1998 | 6/16/1998 | 6/16/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 6/15/1998 | 6/16/1998 | 6/16/1998 | A | PASS |
Jim Sly
|
|
|
06/16/98 316 - brandon ###-####
|
INSP - Framing/Rough-in | 6/11/1998 | 6/12/1998 | 6/12/1998 | P | FAIL |
Jim Sly
|
|
|
06/12/98 316 - C/N....Straps and 16d nails in hanger
|
INSP - Foundation | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | NR |
Jim Sly
|
|
|
06/05/98 316 - Should be shear panel insp....cancel....
|
INSP - Wall cover | 6/5/1998 | 6/5/1998 | 6/5/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - Straps and nailing OK ...shear...
|
INSP - Framing/Rough-in | 6/2/1998 | 6/3/1998 | 6/3/1998 | A | FAIL |
Jim Sly
|
|
|
06/03/98 316 - sheer wall...C/N...Need appr plans on site.
|
INSP - Framing/Rough-in | 5/27/1998 | 5/28/1998 | 5/28/1998 | A | FAIL |
Jim Sly
|
|
|
05/28/98 316 - NR.....SHEAR WALL INSPECTION BRANDON ###-####
|
INSP - Conference | 5/20/1998 | 5/20/1998 | 5/20/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - Conf with bldr.....
|
INSP - Foundation | 4/24/1998 | 4/30/1998 | 4/30/1998 | A | FAIL |
Tom Arcoraci
|
|
|
04/30/98 408 - poured without inspection
|