INSP - Final | 2/5/1999 | 2/5/1999 | 2/5/1999 | P | PASS |
Jim Sly
|
|
|
02/05/99 316 - C/C # 16124
|
INSP - Final | 2/4/1999 | 2/4/1999 | 2/4/1999 | P | FAIL |
Jim Sly
|
|
|
02/04/99 316 - C/N...Provide previous (final) correction notice.
|
INSP - Final | 11/19/1998 | 11/19/1998 | 11/19/1998 | | FAIL |
Jim Sly
|
|
|
11/18/98 316 - C/N....Temp glass, energy code....
|
INSP - Energy code compliance | 6/12/1998 | 6/15/1998 | 6/15/1998 | A | PASS |
Jim Sly
|
|
|
06/15/98 316 -
|
INSP - Framing/Rough-in | 6/15/1998 | 6/15/1998 | 6/15/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - OK'd but still have pending corr. on light and ventilation i
|
INSP - Framing/Rough-in | 6/11/1998 | 6/11/1998 | 6/11/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N....Need light and vent req bsmt....
|
INSP - Framing/Rough-in | 6/11/1998 | 6/11/1998 | 6/11/1998 | P | CANC |
Tom Arcoraci
|
|
|
06/11/98 408 - framing/ steve ###-#### DONE BY 316
|
INSP - Foundation | 5/18/1998 | 5/18/1998 | 5/18/1998 | P | CANC |
Tom Arcoraci
|
|
|
05/18/98 408 - this should be a partial frame inspec for holddowns
|
INSP - Framing/Rough-in | 5/18/1998 | 5/18/1998 | 5/18/1998 | | PART |
Tom Arcoraci
|
|
|
/ / 408 - brace panel nailing ok hold downs need thru bolts c/n
|
INSP - Foundation | 5/13/1998 | 5/14/1998 | 5/14/1998 | A | FAIL |
Tom Arcoraci
|
|
|
05/14/98 408 - swag brace inspection steve ###-#### NO APPROVED PLANS ON SITE NO HUMANS ON SITE C/N ISSUED
|
INSP - Foundation | 4/2/1998 | 4/3/1998 | 4/3/1998 | A | PART |
Tom Arcoraci
|
|
|
04/03/98 408 - RANDY ###-####--FOOTING footing poured without inspection no aproved plans soils ok
|