Permanent Occupancy | | 6/22/1998 | 6/22/1998 | | DONE |
|
|
|
|
INSP - Final | 5/11/1998 | 5/12/1998 | 5/12/1998 | P | PASS |
Jim Sly
|
|
|
05/12/98 316 - OK for Perm Occ....
|
INSP-Final Inspection | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PASS |
Joe Tawney
|
|
|
05/12/98 406 - ###-#### FINAL OK FOR PERM OCC
|
INSP - Framing/Rough-in | 5/1/1998 | 5/4/1998 | 5/4/1998 | A | PART |
Jim Sly
|
|
|
05/04/98 316 - ceiling Grid Ok.......
|
INSP-Sprinkler Rough-in/Hydro | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN
|
INSP - Framing/Rough-in | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | FAIL |
Jim Sly
|
|
|
04/16/98 316 - C/N...Firestop penitrations corridor walls, brace framed
|