BLD-Other | 4/5/2000 | 4/5/2000 | 4/5/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 09:44:21. Contact: ###-####. Final insp. pass 4/6/00 8:47:00 AM
|
INSP - Framing/Rough-in | 5/11/1998 | 5/11/1998 | 5/11/1998 | P | PASS |
|
|
|
05/11/98 338 - made ok c/n removed
|
INSP - Framing/Rough-in | 5/4/1998 | 5/5/1998 | 5/6/1998 | P | PART |
|
|
|
05/05/98 338 - c/n issued hold downs,anchor bolts.shear nailing ok to ro
|
INSP - Foundation | 4/20/1998 | 4/20/1998 | 4/20/1998 | P | PASS |
|
|
|
04/20/98 338 - SETBACKS APPEAR OK TOLD THEM TO PUT THE STRAPS IN THE FOU
|