INSP - Framing/Rough-in | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PART |
Jim Storey
|
|
|
10/15/98 301 - DANIEL- ###-#### RE-INSP ON FR CORR-CORREC-CALL FOR REINSP WHEN COMPLETED front gable truss needs verifacation as to how truss is to be assembled ie conections.
|
INSP - Framing/Rough-in | 9/14/1998 | 9/15/1998 | 9/15/1998 | P | FAIL |
Jim Storey
|
|
|
09/15/98 301 - SUSAN ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 9/4/1998 | 9/4/1998 | 9/4/1998 | | FAIL |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Framing/Rough-in | 9/2/1998 | 9/4/1998 | 9/4/1998 | A | NR |
Jim Storey
|
|
|
09/04/98 301 - dan ###-####-trans to tom a.
|
INSP - Concrete | 4/20/1998 | 4/20/1998 | 4/20/1998 | P | PART |
Jim Storey
|
|
|
04/20/98 301 - footing ok / p/l verrify that front line is min. 5 foot s
|