INSP - Final | 11/3/1998 | 11/3/1998 | 11/3/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - 8:30 apt plaza 4 lobby
|
INSP - Final | 11/3/1998 | 11/3/1998 | 11/3/1998 | P | NR |
Wes Worcester
|
|
|
11/03/98 342 - DAVE ###-#### PLEASE CALL FIRST
|
INSP-Final Inspection | 10/16/1998 | 10/16/1998 | 10/16/1998 | P | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP-Final Inspection | 10/9/1998 | 10/9/1998 | 10/9/1998 | P | FAIL |
Rick Jackson
|
|
|
EARL ###-#### AT 5:00 PM speaker in conference rooms
|
INSP - Final | 9/9/1998 | 9/10/1998 | 9/10/1998 | P | PART |
Wes Worcester
|
|
|
09/10/98 342 - DAVE ###-#### 11-11:30am apt
|
INSP-Alarm Testing | 9/8/1998 | 9/9/1998 | 9/9/1998 | P | PART |
Rick Jackson
|
|
|
Scheduled by Hello!. Contact phone is [8874774]. temp occ approved for 1, 3 and 4 floors. sprinkler head spacing (3 and 4), strobes not activating properly, rated doors in corridor
|
INSP - Framing/Rough-in | 8/19/1998 | 8/19/1998 | 8/19/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - 10 am apt
|
INSP - Framing/Rough-in | 8/18/1998 | 8/19/1998 | 8/19/1998 | P | PART |
Wes Worcester
|
|
|
08/19/98 342 - call dave ###-#### before going
|
INSP - Framing/Rough-in | 8/11/1998 | 8/12/1998 | 8/12/1998 | A | PART |
Wes Worcester
|
|
|
08/11/98 342 - DAVE MILLER ###-#### PLEASE CALL BEFORE YOU GO OUT
|
INSP - Framing/Rough-in | 7/30/1998 | 7/31/1998 | 7/31/1998 | A | PART |
Jim Storey
|
|
|
07/31/98 301 - ###-#### TCO -TEMP C OF O ISSUED w/c/n and time line for completion of each floor phase out the permit as a whole dave the genral has copy of this doc.
|
INSP-Final Inspection | 7/29/1998 | 7/31/1998 | 7/31/1998 | P | PART |
Rick Jackson
|
|
|
WANTS A TEMP OCC--DAVE ###-#### EARLY PM temp occ approved for 5th floor only. corridor penetrations being worked and will be complete by 8/13
|
INSP - Final | 7/29/1998 | 7/30/1998 | 7/30/1998 | P | NR |
Carl Dependahl
|
|
|
WANTS A TEMP OCC--DAVE ###-#### SAYS HAD MTG W/ G.S...WANTED STOREY TO COME OUT.
|
INSP-Final Inspection | 7/30/1998 | 7/30/1998 | 7/30/1998 | P | CANC |
Rick Jackson
|
|
|
earl ###-#### 5th floor final general contractor requested this inspection for 7/31
|
INSP-Final Inspection | 7/20/1998 | 7/22/1998 | 7/22/1998 | P | FAIL |
Rick Jackson
|
|
|
READY AT 2PM EARL ###-#### ON THE FIFTH FLOOR audibles not loud enough; pentrations in corridor; door hardware; exit signs; extinguishers; knox box keys; smoke/fire dampers; alarm plans for scope of permit
|
INSP - Wall cover | 6/26/1998 | 6/29/1998 | 6/29/1998 | A | PASS |
Wes Worcester
|
|
|
06/29/98 342 - Scheduled by Hello!. dave ###-#### appt at 9:30 per wes.
|
INSP - Framing/Rough-in | 6/19/1998 | 6/19/1998 | 6/19/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - 8 am apt on 5th floor
|
INSP - Framing/Rough-in | 6/19/1998 | 6/19/1998 | 6/19/1998 | P | PART |
Wes Worcester
|
|
|
06/19/98 342 - steel stud framing on the fifth floor left job site....w 8am ###-#### Ken Farris
|
INSP - Framing/Rough-in | 6/9/1998 | 6/9/1998 | 6/9/1998 | P | PASS |
Wes Worcester
|
|
|
06/09/98 342 - 5TH FLOOR--DAVE ###-####
|