INSP - Final | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PASS |
Russ Owen
|
|
|
07/16/98 407 - tim/ ###-#### pager
|
INSP - Letter of compliance | 7/16/1998 | 7/16/1998 | 7/16/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14729 NOTE:TIM WILL ADD SUPPORT TO A FLOOR JOIST AT THE D REQUESTED BY PRIOR INSPECTION.
|
INSP - Letter of compliance | 7/16/1998 | 7/16/1998 | 7/16/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14729 NOTE:TIM WILL ADD SUPPORT TO A FLOOR JOIST AT THE D REQUESTED BY PRIOR INSPECTION.
|
INSP - Wall cover | 6/4/1998 | 6/4/1998 | 6/4/1998 | A | NR |
Russ Owen
|
|
|
contrator called and told me that information on the vinyl siding would be under gas log stove,But ther was no information at the site to be found.
|
INSP - Energy code compliance | 6/1/1998 | 6/2/1998 | 6/3/1998 | A | PART |
Russ Owen
|
|
|
06/02/98 407 - still need to ad high R at garage warm wall.
|
INSP - Energy code compliance | 6/2/1998 | 6/2/1998 | 6/2/1998 | | FAIL |
Russ Owen
|
|
|
/ / 407 - Need to add some vapor barrier in some locations.
|
INSP - Framing/Rough-in | 6/1/1998 | 6/2/1998 | 6/2/1998 | A | PASS |
Russ Owen
|
|
|
06/02/98 407 - REINSPECTION ON FRAMING /DOLLAND ###-####
|
INSP - Framing/Rough-in | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | FAIL |
Russ Owen
|
|
|
PLEASE CALL TIM BEFORE YOU GO--1/2 HR BEFORE-###-####
|
INSP - Foundation | 4/16/1998 | 4/16/1998 | 4/16/1998 | P | PART |
Russ Owen
|
|
|
partial inspection of footings only ok. But Early start permit no approved plans at this time, set backs appear ok for typical requirements.
|