INSP - Final | 10/6/1998 | 10/6/1998 | 10/6/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL
|
INSP - Final | 10/2/1998 | 10/2/1998 | 10/2/1998 | | FAIL |
Jim Storey
|
|
|
10/01/98 301 - STEVE ###-#### OR ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED pending ele final.
|
INSP - Energy code compliance | 8/3/1998 | 8/3/1998 | 8/3/1998 | P | |
Jim Storey
|
|
|
steve ###-#### insulation
|
INSP - Framing/Rough-in | 7/31/1998 | 7/31/1998 | 7/31/1998 | P | PASS |
Jim Storey
|
|
|
07/31/98 301 - shear wall ###-#### FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 6/24/1998 | 6/25/1998 | 6/26/1998 | A | PART |
Jim Storey
|
|
|
06/24/98 301 - Scheduled by Hello!. Contact phone is [8660507]. GWB -OK SHEETROCK NAILING inside wall at grarge septration.
|
INSP - Foundation | 5/19/1998 | 5/19/1998 | 5/19/1998 | P | PART |
Jim Storey
|
|
|
05/19/98 301 - PEIR FOOTINGS WRONG SIZE ALL OTHER FOOTINGS OK
|