INSP - Final | 9/22/1998 | 9/22/1998 | 9/22/1998 | P | PASS |
Russ Owen
|
|
|
09/22/98 407 - brian ###-#### reinspect
|
INSP - Letter of compliance | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#15939
|
INSP - Letter of compliance | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#15939
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | FAIL |
Russ Owen
|
|
|
09/18/98 407 - Energy code does not comply in basement.
|
INSP - Final | 9/17/1998 | 9/17/1998 | 9/17/1998 | P | CANC |
Russ Owen
|
|
|
09/17/98 407 - brian ###-#### reinspect
|
INSP - Final | 9/15/1998 | 9/16/1998 | 9/16/1998 | P | NR |
Russ Owen
|
|
|
09/16/98 407 - BRIAN ###-####
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PART |
Russ Owen
|
|
|
meet with framer to try to resolve stairs he will correct some.
|
INSP - Framing/Rough-in | 8/25/1998 | 8/25/1998 | 8/25/1998 | P | FAIL |
Russ Owen
|
|
|
went out to look at winder stairs,as prior correction still has not been resolved at framing inspection ,i have called contractor about this matter ones to basement ok i would like some work done to main level.
|
INSP - Energy code compliance | 7/6/1998 | 7/7/1998 | 7/7/1998 | A | PASS |
Russ Owen
|
|
|
07/07/98 407 - re-inspection engery code. ###-####
|
INSP - Energy code compliance | 7/2/1998 | 7/6/1998 | 7/6/1998 | A | FAIL |
Russ Owen
|
|
|
07/06/98 407 - BRYAN ###-#### REINSPECTION
|
INSP - Energy code compliance | 6/30/1998 | 7/1/1998 | 7/1/1998 | A | FAIL |
Russ Owen
|
|
|
07/01/98 407 - Doug ###-#### ì
|
INSP - Framing/Rough-in | 6/30/1998 | 7/1/1998 | 7/1/1998 | A | FAIL |
Russ Owen
|
|
|
07/01/98 407 - Doug ###-#### ì
|
INSP - Framing/Rough-in | 6/26/1998 | 6/26/1998 | 6/26/1998 | A | FAIL |
Russ Owen
|
|
|
left corrections.
|
INSP - Framing/Rough-in | 6/24/1998 | 6/25/1998 | 6/25/1998 | A | CANC |
Russ Owen
|
|
|
06/25/98 407 - cancell no electrical approvl.BEFORE YOU GO OUT IN ENOUGH CAN MEET YOU THERE
|
INSP - Foundation | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PART |
Russ Owen
|
|
|
04/28/98 407 - pouring at time of inspection,appears ok,exposed sections footings has the 2 rebars,No approved plans at the site.
|