INSP - Final | 5/12/1999 | 5/13/1999 | 5/13/1999 | A | PASS |
Tom Arcoraci
|
|
|
05/13/99 408 - Jerry ###-####
|
INSP - Final | 5/11/1999 | 5/12/1999 | 5/12/1999 | A | FAIL |
Jim Sly
|
|
|
05/12/99 316 - C/N....Crawl ...HVAC insulate, ...
|
INSP - Framing/Rough-in | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PASS |
Jim Sly
|
|
|
10/13/98 316 - jerry elliott ###-#### for insulation insp
|
INSP - Framing/Rough-in | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | PASS |
Jim Sly
|
|
|
10/09/98 316 - jerry elliott-###-#### re-fr insp
|
INSP - Framing/Rough-in | 9/22/1998 | 9/23/1998 | 9/23/1998 | P | FAIL |
Jim Storey
|
|
|
09/23/98 301 - jerry ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED 2 of 2
|
INSP - Framing/Rough-in | 7/1/1998 | 7/2/1998 | 7/2/1998 | A | PASS |
Jim Sly
|
|
|
07/02/98 316 - Generic shear OK...Need to check drag strut at front wall
|
INSP - Foundation | 5/6/1998 | 5/6/1998 | 5/6/1998 | P | PASS |
Jim Sly
|
|
|
05/06/98 316 - JERRY ELLIOTT ###-#### FT ONLY
|