INSP - Final | 2/8/1999 | 2/9/1999 | 2/9/1999 | P | PASS |
Jim Sly
|
|
|
02/09/99 316 - C/C # 16132
|
INSP - Final | 2/5/1999 | 2/8/1999 | 2/8/1999 | A | FAIL |
Jim Sly
|
|
|
02/08/99 316 - Done by Alan H.
|
INSP - Energy code compliance | 8/26/1998 | 8/26/1998 | 8/26/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Jim Sly
|
|
|
08/26/98 316 - bruce ###-####
|
INSP - Framing/Rough-in | 8/21/1998 | 8/24/1998 | 8/24/1998 | A | FAIL |
Jim Sly
|
|
|
08/24/98 316 - C/N...Nails in hangers, transf point load, restrain truss
|
INSP - Foundation | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | FAIL |
Jim Sly
|
|
|
/ / 316 - Poured W/O..Soil, foot width, height OK....setbks appear OK.
|
INSP - Foundation | 6/5/1998 | 6/8/1998 | 6/8/1998 | A | FAIL |
Jim Sly
|
|
|
06/08/98 316 - Wanted early (it's 8:30 am)..forms 1/2 done...No one and
|