Permanent Occupancy | | 3/3/1999 | 3/3/1999 | | DONE |
|
|
|
|
INSP - Final | 2/25/1999 | 2/25/1999 | 2/25/1999 | P | PASS |
|
|
|
02/25/99 338 - madeok other agencies approved
|
INSP - Final | 12/29/1998 | 12/29/1998 | 12/29/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 12/29/1998 | 12/29/1998 | 12/29/1998 | P | FAIL |
|
|
|
12/29/98 338 - should be fire life safwety
|
INSP - Final | 11/9/1998 | 11/10/1998 | 11/10/1998 | A | PASS |
|
|
|
11/10/98 338 - made ok for temp occ signed the temp col per 406
|
INSP-Final Inspection | 11/6/1998 | 11/9/1998 | 11/9/1998 | P | PART |
Joe Tawney
|
|
|
11/09/98 406 - MICK ###-#### REINSP OK FOR TEMP OCC VALVE SUPRV, INSUL BLOCKING HDS, DUCT DET, PAPER ì
|
INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 | A | FAIL |
Tom Arcoraci
|
|
|
11/05/98 408 - ###-#### FINAL not ready
|
INSP - Final | 11/5/1998 | 11/5/1998 | 11/5/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL SPKLR SYSTEM, ALARM SYSTEM, EXIT SIGNS, FIRE EXT
|
INSP-Final Inspection | 11/2/1998 | 11/3/1998 | 11/3/1998 | P | CANC |
Joe Tawney
|
|
|
11/03/98 406 - RANDY- ###-#### FN FIRE INSP-CALL 1ST CANCELLED TO BE RESCHED FOR THUR 11/5/98
|
INSP-Sprinkler Rough-in/Hydro | 10/19/1998 | 10/19/1998 | 10/19/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN FAIL TRAPPED LINES MISSING HDS BRACING SLANTING OF
|
INSP-Sprinkler Rough-in/Hydro | 10/15/1998 | 10/15/1998 | 10/15/1998 | P | CANC |
Joe Tawney
|
|
|
10/15/98 406 - mick cell ###-#### conference with joe CANCELLED
|
INSP-Sprinkler Rough-in/Hydro | 10/14/1998 | 10/14/1998 | 10/14/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - SPKLR ROUGH IN FAIL APPROVED PLANS ACCESS TO PIPING
|
INSP-Sprinkler Rough-in/Hydro | 10/13/1998 | 10/13/1998 | 10/13/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE GROUND HYDRO TEST EXCEPT FDC PIPING
|
INSP - Framing/Rough-in | 10/12/1998 | 10/13/1998 | 10/12/1998 | A | PART |
|
|
|
10/15/98 338 - made ok to drop in the ceiling tiles
|
INSP-Sprinkler Rough-in/Hydro | 10/12/1998 | 10/12/1998 | 10/12/1998 | | CANC |
Joe Tawney
|
|
|
10/12/98 406 - FIDEL- CELL ###-#### -BERNELL -###-#### R-IN INSP CANCELLED
|
INSP - Framing/Rough-in | 10/2/1998 | 10/5/1998 | 10/6/1998 | A | PART |
|
|
|
10/05/98 338 - MADE OK TO LAY IN TILES IN THE SOUTH WEST AREAS
|
INSP - Framing/Rough-in | 9/10/1998 | 9/11/1998 | 9/11/1998 | A | PART |
|
|
|
09/11/98 338 - RANDY ###-####
|
INSP - Framing/Rough-in | 8/24/1998 | 8/25/1998 | 8/25/1998 | A | PART |
|
|
|
08/25/98 338 - made ok to ijnsulate
|
INSP - Framing/Rough-in | 8/18/1998 | 8/19/1998 | 8/20/1998 | A | PART |
|
|
|
08/19/98 338 - 0k to insulate the west wing
|
INSP - Framing/Rough-in | 8/13/1998 | 8/13/1998 | 8/13/1998 | P | PASS |
|
|
|
08/13/98 338 - mad ok still working on imbeds and hold downs
|
INSP - Concrete | 8/7/1998 | 8/10/1998 | 8/10/1998 | A | PART |
|
|
|
08/10/98 338 - made ok to pour r-bar placed stair well
|
INSP - Foundation | 7/27/1998 | 7/27/1998 | 7/28/1998 | P | PART |
|
|
|
07/27/98 338 - madeok with sp insp blessing
|
INSP - Concrete | 7/22/1998 | 7/23/1998 | 7/23/1998 | A | PART |
|
|
|
07/23/98 338 - made ok with sp insp approval
|
INSP - Foundation | 7/21/1998 | 7/22/1998 | 7/22/1998 | A | PART |
|
|
|
07/22/98 338 - made ok with sp insp approval
|
INSP - Foundation | 7/20/1998 | 7/21/1998 | 7/21/1998 | A | PART |
|
|
|
07/21/98 338 - AS PER 338 10:30 / DICK ###-#### MADE OK TO POUR FORMS AN
|
INSP - Foundation | 7/17/1998 | 7/20/1998 | 7/20/1998 | A | FAIL |
|
|
|
footing. ready 10 ###-#### NOT READY RECALL WHEN SAME IS TRUE
|
INSP-Supply line flush | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PART |
Joe Tawney
|
|
|
07/16/98 406 - Mick ###-#### cell phone OK ON SUPPLY LINE FLUSH AND UNDERGROUND HYDRO TEST
|
INSP - Concrete | 7/13/1998 | 7/13/1998 | 7/13/1998 | P | PART |
|
|
|
07/13/98 338 - made ok ro pour with sp insp approval r-bar placed forms
|
INSP - Foundation | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | PART |
|
|
|
07/09/98 338 - tom at 11 they are going to pour Randy ###-#### r-bar pla
|
INSP - Foundation | 6/30/1998 | 7/1/1998 | 7/1/1998 | A | PASS |
|
|
|
07/01/98 338 - ade k sp insp ok recvd sp insp letter from owner
|
INSP - Framing/Rough-in | 6/29/1998 | 6/29/1998 | 6/29/1998 | P | PART |
|
|
|
06/29/98 338 - Conference Randy ###-#### MADE OK ON CONF WITH PROJ. MAN
|