Permit Information
Permit NumberBLD98-01044
StatusFinaled
Name BILL THORNTON
Site Address 6493 S HORNBEAM PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1822 sq. ft. one story single family dwelling with a 763 sq. ft. attached three car garage and 130 sq. ft. covered concrete patio per approved plans, attached engineering and requirement lists. PC #322 ACHD #98-1292 SOLAR PROTECTED DJO MASTER FILE #09-97-003
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/16/19989/16/19989/16/1998PPASS
DetailsRuss Owen
09/16/98 407 - harold ###-####
INSP - Letter of compliance9/16/19989/16/19989/16/1998 PASS
DetailsRuss Owen
/ / 407 - LC#15832
INSP - Letter of compliance9/16/19989/16/19989/16/1998 PASS
DetailsRuss Owen
/ / 407 - LC#15832
INSP - Final9/14/19989/15/19989/15/1998AFAIL
DetailsRuss Owen
09/15/98 407 - left corrections
INSP - Framing/Rough-in6/29/19986/29/19986/30/1998PPASS
DetailsRuss Owen
06/29/98 407 - Ok to put on finished siding.
INSP - Framing/Rough-in6/25/19986/26/19986/26/1998PFAIL
DetailsRuss Owen
06/26/98 407 - stil have corrections.BILL ###-####
INSP - Framing/Rough-in6/24/19986/24/19986/24/1998PFAIL
DetailsRuss Owen
Left corrects.
INSP - Framing/Rough-in6/23/19986/23/19986/23/1998PPASS
DetailsRuss Owen
06/23/98 407 - sheer panel/ bill ###-#### ok.
INSP - Framing/Rough-in6/18/19986/19/19986/19/1998APART
DetailsRuss Owen
06/19/98 407 - still have 1 correction.RE-INSPECTION SHEER WALL/ 331-366
INSP - Framing/Rough-in6/18/19986/18/19986/18/1998 FAIL
DetailsRuss Owen
/ / 407 - shear nailing ,left corrections..
INSP - Framing/Rough-in6/12/19986/12/19986/12/1998PFAIL
DetailsTom Arcoraci
06/12/98 408 - SHEER PANEL INSP Bill ###-#### c/n issued
INSP - Foundation4/30/19984/30/19985/1/1998PPART
DetailsRuss Owen
04/30/98 407 - FOOTING INSP ON EARLY START.The footings and walls have been pored prior to the inspection,and is now complete.No approved plans on site, work appears to meet set backs.