INSP - Final | 10/15/1998 | 10/16/1998 | 10/16/1998 | A | FAIL |
Jim Storey
|
|
|
10/16/98 301 - Scheduled by Hello!. Contact phone is [8676771]. russ called and is doing insp.
|
INSP - Final | 10/16/1998 | 10/16/1998 | 10/16/1998 | | FAIL |
Jim Storey
|
|
|
10/16/98 301 - Scheduled by Hello!. Contact phone is [8676771]. russ called and is doing insp.
|
INSP - Final | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 -
|
INSP - Final | 10/19/1998 | 10/16/1998 | 10/16/1998 | A | PASS |
Russ Owen
|
|
|
ISSUED LC
|
INSP - Wall cover | 10/9/1998 | 10/9/1998 | 10/9/1998 | P | CANC |
Russ Owen
|
|
|
10/09/98 407 - cancell wrong one.!. Contact phone is [8676771].
|
INSP - Energy code compliance | 8/7/1998 | 8/10/1998 | 8/10/1998 | A | PASS |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [8676771].
|
INSP - Energy code compliance | 8/7/1998 | 8/7/1998 | 8/7/1998 | P | NR |
Russ Owen
|
|
|
not ready.
|
INSP - Framing/Rough-in | 8/5/1998 | 8/5/1998 | 8/5/1998 | A | FAIL |
Russ Owen
|
|
|
08/05/98 407 - left corrections.
|
INSP - Framing/Rough-in | 7/30/1998 | 8/4/1998 | 8/5/1998 | P | FAIL |
Russ Owen
|
|
|
08/04/98 407 - left correction.lo!. Contact phone is [8676771].
|
INSP - Framing/Rough-in | 7/16/1998 | 7/17/1998 | 7/17/1998 | A | PART |
Russ Owen
|
|
|
Joe ###-####
|
INSP - Foundation | 6/29/1998 | 6/30/1998 | 6/30/1998 | A | PART |
Russ Owen
|
|
|
06/30/98 407 - Footings have been poured with-out inspection and walls are now up and ready to be poured.
|