INSP - Final | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | PASS |
Jim Storey
|
|
|
11/24/98 301 - FNL -OK FINAL
|
INSP - Wall cover | 8/21/1998 | 8/24/1998 | 8/24/1998 | A | CANC |
Russ Owen
|
|
|
SHEER WALL--GARY ###-####
|
INSP - Framing/Rough-in | 8/10/1998 | 8/10/1998 | 8/11/1998 | P | PASS |
Russ Owen
|
|
|
08/10/98 407 - gary ###-#### ì
|
INSP - Framing/Rough-in | 8/6/1998 | 8/7/1998 | 8/7/1998 | A | PART |
Russ Owen
|
|
|
###-#### call framer for meeting time gary ###-####
|
INSP - Framing/Rough-in | 8/7/1998 | 8/7/1998 | 8/7/1998 | P | PART |
Russ Owen
|
|
|
dave ###-####
|
INSP - Framing/Rough-in | 8/3/1998 | 8/3/1998 | 8/4/1998 | P | CANC |
Russ Owen
|
|
|
08/03/98 407 - trans to 301. ì
|
INSP - Framing/Rough-in | 7/31/1998 | 7/31/1998 | 7/31/1998 | P | CANC |
Russ Owen
|
|
|
07/31/98 407 - this is the incorrect permit number.
|
INSP - Wall cover | 7/30/1998 | 7/30/1998 | 7/31/1998 | P | FAIL |
Russ Owen
|
|
|
07/30/98 407 - ###-#### DAVE ALLEN
|
INSP - Framing/Rough-in | 7/28/1998 | 7/29/1998 | 7/29/1998 | A | FAIL |
Russ Owen
|
|
|
gary ###-#### reinspection
|
INSP - Framing/Rough-in | 7/27/1998 | 7/27/1998 | 7/27/1998 | A | FAIL |
Russ Owen
|
|
|
left corrections.
|
INSP - Framing/Rough-in | 7/1/1998 | 7/1/1998 | 7/1/1998 | A | PART |
Russ Owen
|
|
|
Conferance about pre-framing inspection.
|
INSP-Conference | 6/30/1998 | 6/30/1998 | 7/1/1998 | P | CANC |
Russ Owen
|
|
|
06/30/98 407 - conf. rob ###-####
|
INSP - Framing/Rough-in | 6/18/1998 | 6/19/1998 | 6/19/1998 | A | PASS |
Russ Owen
|
|
|
06/19/98 407 - nailing / rob ###-####
|