INSP - Foundation | 10/16/1998 | 10/16/1998 | 10/16/1998 | A | PASS |
Bob Archibald
|
|
|
Placed w/out inspection appears ok.
|
INSP - Final | 8/14/1998 | 8/14/1998 | 8/14/1998 | P | PASS |
Wes Worcester
|
|
|
08/14/98 342 - key in the electrical outlet next to the front door jeff ###-####office
|
INSP - Energy code compliance | 6/26/1998 | 6/26/1998 | 6/26/1998 | P | PART |
Carl Dependahl
|
|
|
will place hi-r at garage per conf w/ 2J scott.
|
INSP - Framing/Rough-in | 6/26/1998 | 6/26/1998 | 6/26/1998 | P | PART |
Carl Dependahl
|
|
|
discussed fire wall & door (dbl?) w/ bldr...need install bonus room wall or?
|
INSP - Energy code compliance | 6/25/1998 | 6/25/1998 | 6/25/1998 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ins ok, ok to cover need hi-r or wattsun at hse-gar walls
|
INSP - Energy code compliance | 6/25/1998 | 6/25/1998 | 6/25/1998 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ins ok, ok to cover need hi-r or wattsun at hse-gar walls
|
INSP - Framing/Rough-in | 6/24/1998 | 6/25/1998 | 6/25/1998 | P | PASS |
Carl Dependahl
|
|
|
06/25/98 340 - jeff ###-#### cn ok
|
INSP - Conference | 6/24/1998 | 6/24/1998 | 6/24/1998 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - re c/n of 6-23-98
|
INSP - Framing/Rough-in | 6/22/1998 | 6/23/1998 | 6/23/1998 | P | FAIL |
Carl Dependahl
|
|
|
06/24/98 340 - ###-####...c/n: nailing, straps, add studs at brg, ok to
|
INSP - Framing/Rough-in | 6/22/1998 | 6/22/1998 | 6/22/1998 | A | NR |
Carl Dependahl
|
|
|
not insp; conf w/ Jeff Scott...ok to place insulation. Need plans, told to check note written w/ htg correction.
|
INSP - Framing/Rough-in | 6/18/1998 | 6/19/1998 | 6/19/1998 | P | FAIL |
Carl Dependahl
|
|
|
jeff ###-####; no plans, $42 NEXT TIME. PREV C/N REMOVED FROM SITE PER BA
|
INSP - Foundation | 5/5/1998 | 5/5/1998 | 5/5/1998 | P | PART |
|
|
|
05/05/98 333 - PWOI
|