INSP - Final | 6/10/1999 | 6/10/1999 | 6/10/1999 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 17600 ISSUED
|
INSP - Final | 6/8/1999 | 6/9/1999 | 6/9/1999 | A | PASS |
Carl Dependahl
|
|
|
06/09/99 340 - ###-####//FINALok, l/c issued at site. will bring card in
|
INSP - Final | 6/8/1999 | 6/8/1999 | 6/8/1999 | | NH |
Carl Dependahl
|
|
|
06/08/99 340 - Scheduled by Hello!. Contact phone is [8692072].
|
INSP - Final | 5/18/1999 | 5/18/1999 | 5/18/1999 | | FAIL |
Wes Worcester
|
|
|
05/18/99 342 - Scheduled by Hello!. Contact phone is [8692072].
|
INSP-Final Inspection | 3/16/1999 | 3/17/1999 | 3/17/1999 | A | PASS |
Joe Tawney
|
|
|
03/17/99 406 - REINSP OK FOR CERT OF COMPLETION ON SHELL
|
INSP-Final Inspection | 2/25/1999 | 2/26/1999 | 2/26/1999 | A | FAIL |
|
|
|
Scheduled by Hello!. Contact phone is [8692072]. no alarm plans provided, alarm panel not correct for sprinkler supervisory. Fire Riser room not protected w/ 1 hr construction.
|
INSP-Sprinkler Rough-in/Hydro | 2/18/1999 | 2/18/1999 | 2/18/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE AND UNDERGROUND HYDRO TESTS
|
INSP-Supply line flush | 2/17/1999 | 2/17/1999 | 2/17/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH
|
INSP - Framing/Rough-in | 11/17/1998 | 11/18/1998 | 11/19/1998 | P | PART |
|
|
|
11/19/98 338 - made ok for the ext wall insulation and efis to be instal
|
INSP - Framing/Rough-in | 11/18/1998 | 11/18/1998 | 11/18/1998 | | PART |
|
|
|
11/18/98 338 - made ok for cover ext of ext walls and
|
INSP - Foundation | 9/23/1998 | 9/24/1998 | 9/24/1998 | A | PART |
|
|
|
09/24/98 338 - made ok r-bar placed for rest of footings and the first s
|
INSP - Foundation | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PART |
|
|
|
09/17/98 338 - MADE OK TO POUR R-BAR IS PLACED BULKHEADS IN PLACE. NORTH
|