Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD98-01231
StatusFinaled
Name MICRON TECH
Site Address 8000 S FEDERAL WAY
Project NameMICRON BLDG 1 (1810)
Customer Number1810
ePlanReviewNo
Description
BUILDING #1 - F1 STEP DUV 2308-2310 REMODEL (STRUCTURAL PHASE) (PROJECT #1-971810) * TO SAWCUT AND REMOVE APPROXIMATELY 1400 SQ. FT. OF THE EXISTING CONCRETE FLOOR AND TRENCH WALLS AND TO REMOVE STRUCTURAL CONCRETE FOOTINGS AS INDICATED; AND TO DEMOLISH AND REMOVE APPROXIMATELY 1400 SQ. FT. OF THE SECOND FLOOR MECHANICAL SUPPORT AREA ABOVE THIS AREA. TO CONSTRUCT NEW CONCRETE FOUNDATION WALLS, STRUCTURAL FOOTINGS AND LOWERED CONCRETE SLAB FLOOR, AS WELL AS, RECONSTRUCTING THE SECOND FLOOR MECHANICAL SUPPORT AREA WITH REQUIRED STEEL BEAMS AND COLUMNS AND NEW 3/4 INCH T&G STRUCTURAL PLYWOOD FLOOR DECK. THIS PERMIT IS FOR THE DEMOLITION AND CONSTRUCTION OF THE STUCTURAL PORTION OF THIS BUILDING REMODEL. THE FINISH OF THIS CLEAN ROOM AREA WILL BE DONE UNDER A SEPARATE PERMIT. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. THIS WORK IS BEING DONE BETWEEN GRIDLINES 3&4 AND F.1&D.5. ALL CONSTRUCTION PER THE APPROVED PLANS ON FILE. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/3/19989/4/19989/4/1998APASS
DetailsJim Storey
09/04/98 301 - Scheduled by Hello!. FNL -OK FINAL
INSP - Framing/Rough-in8/24/19988/24/19988/24/1998PPASS
DetailsJim Storey
08/24/98 301 - Scheduled by Hello!. Contact phone is [8673521]. SHRW-OK SHEARfloor screwing ok per approved plan.
INSP - Framing/Rough-in8/19/19988/20/19988/20/1998AFAIL
DetailsJim Storey
08/20/98 301 - Scheduled by Hello!. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in8/6/19988/6/19988/6/1998 PASS
DetailsJim Storey
/ / 301 - strucral steel framing ok special insp. reports ok
INSP - Framing/Rough-in7/23/19987/24/19987/27/1998APART
DetailsJim Storey
07/24/98 301 - Scheduled by Hello!. Contact phone is [8673521]. work in progess steel erection.special insp on site pending reports for conections.
INSP - Foundation7/14/19987/14/19987/14/1998PCANC
DetailsRuss Owen
07/14/98 407 - trans to 301.
INSP - Foundation7/10/19987/13/19987/13/1998APART
DetailsJim Storey
07/13/98 301 - covered w/special insp. report pending
INSP - Foundation7/7/19987/7/19987/7/1998APART
DetailsJim Storey
07/07/98 301 - special insp to be on site pending reports.......