BLD-Final | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | CANC |
Tony Young
|
|
|
###-#### terry records
|
BLD-Grading Inspection | 7/17/2002 | 7/17/2002 | 7/17/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | NR |
Tony Young
|
|
|
GWEN ###-####
|
BLD-Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | FAIL |
Tony Young
|
|
|
GWEN ###-####
need Terry Records sign off 6/14/2002 2:22:22 PM
|
BLD-Conference | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | PART |
Tony Young
|
|
|
check out what is needed for a final, Gwen @ ###-#### 4/22/2002 2:49:23 PM
made a partial list for gwen on issues and procedure to get a final inspection to help her out, ///no approved plans on site 4/23/2002 3:40:14 PM
|
BLD-Conference | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PART |
Tony Young
|
|
|
call gwen first 4/23/2002 11:23:26 AM
see other notes 4/23/2002 4:44:46 PM
|
BLD-Conference | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Tony Young
|
|
|
gwen herman ###-####
owner wants to get project finaled, went over procedure w/ her ///. t/w G.S. he advised me research job to see if b.p. should be re-issued or re-activated. (ok)if minor issues exist //scheduled a time to meet w/ her on am of 4-23-02 4/22/2002 2:58:52 PM
|
BLD-Wall cover | 12/13/1999 | 12/14/1999 | 12/14/1999 | A | CANC |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on vapor barrier Contact: ###-####. BEAT ON DOOR OR GO AROUND BACK IF NOONE ANSWER Done by 407.
|
BLD-Framing/Rough-in | 12/10/1999 | 12/13/1999 | 12/13/1999 | A | FAIL |
Wes Worcester
|
|
|
VAPOR BARRIER JOHN ###-#### No access.
|
BLD-Energy code compliance | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PART |
Russ Owen
|
|
|
Still need vapor barrier, talked with installer told him to comply ASAP as our office has made several inspections.
|
BLD-Wall cover | 12/3/1999 | 12/6/1999 | 12/6/1999 | A | PART |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 15:49:18. Contact: . Given to Russ Owens.
|
BLD-Energy code compliance | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/19/1999 at 14:39:06. Contact: . Ceilings ok and ok to cover chk. Base walls.
|
BLD-Wall cover | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/19/1999 at 14:41:27. Contact: . Ceilings ok to cover ok basement walls.
|
BLD-Energy code compliance | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
Russ Owen
|
|
|
Mrs. Herman ###-#### . Asked that only Russ Owens be sent to this job and nobody else. ??? Did not say why. Will comply with Boise City Energy Code insluation will be added to the existing R-21, inspections will be required, head height at stairs not yet corrected.
|
BLD-Energy code compliance | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | FAIL |
Jim Storey
|
|
|
HERMAN ###-#### C/N
|
BLD-Framing/Rough-in | 10/12/1999 | 10/13/1999 | 10/13/1999 | A | PART |
Wes Worcester
|
|
|
Herman ###-#### Called wrong number for message and left message got message after 11:30. He called Plan Review (aml) Fireblocking and stair head height, ok to insulate, letter fron Briggs Engineering, have been on site inspecting every two weeks, also Roof Truss inspections
|
INSP - Concrete | 4/21/1999 | 4/22/1999 | 4/22/1999 | P | NR |
Russ Owen
|
|
|
04/22/99 407 - Briggs Engineering will inspect walls,they are no t ready
|
INSP - Concrete | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | PASS |
Russ Owen
|
|
|
03/30/99 407 - EXTERIOR FOOTINGS OK, ENGINEER HAS ALSO INSPECTED ,SOILS
|
INSP - Concrete | 3/26/1999 | 3/29/1999 | 3/29/1999 | A | FAIL |
Wes Worcester
|
|
|
03/29/99 342 - ###-#### HERMAN//CONCRETE FOUNDATION @ 8:00
|
INSP - Foundation | 3/26/1999 | 3/26/1999 | 3/26/1999 | | FAIL |
Wes Worcester
|
|
|
03/26/99 342 - phone is [4220257]. not quite ready,will call in for 8:30
|
INSP - Foundation | 3/22/1999 | 3/24/1999 | 3/24/1999 | P | FAIL |
Wes Worcester
|
|
|
03/24/99 342 - Scheduled by Hello!. Contact phone is [4220257]. need en
|
INSP - Foundation | 3/23/1999 | 3/24/1999 | 3/24/1999 | A | FAIL |
Wes Worcester
|
|
|
03/24/99 342 - Scheduled by Hello!. Contact phone is [4220257].
|
INSP - Framing/Rough-in | 9/23/1998 | 9/23/1998 | 9/23/1998 | P | NR |
Wes Worcester
|
|
|
09/23/98 342 - HERMAN-###-#### FOR CONFERENCE -CALL 1ST
|
INSP - Framing/Rough-in | 9/23/1998 | 9/23/1998 | 9/23/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - pre construction conference at ofc in am
|