INSP - Final | 10/8/1998 | 10/8/1998 | 10/9/1998 | P | PASS |
Tom Arcoraci
|
|
|
10/08/98 408 - BRANDON ###-#### CALL FIRST PLEASE
|
INSP - Energy code compliance | 8/14/1998 | 8/14/1998 | 8/14/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 8/13/1998 | 8/14/1998 | 8/14/1998 | A | PASS |
Jim Sly
|
|
|
08/14/98 316 - brandon ###-#### late am
|
INSP - Framing/Rough-in | 8/11/1998 | 8/11/1998 | 8/12/1998 | P | FAIL |
Tom Arcoraci
|
|
|
08/11/98 408 - brandon ###-####
|
INSP - Framing/Rough-in | 7/31/1998 | 8/3/1998 | 8/3/1998 | A | PART |
Jim Sly
|
|
|
08/03/98 316 - shear wall OK
|
INSP - Framing/Rough-in | 7/30/1998 | 7/31/1998 | 7/31/1998 | A | PART |
Jim Sly
|
|
|
07/31/98 316 - WALK THROUGH DELON ................
|
INSP - Foundation | 6/24/1998 | 6/25/1998 | 6/25/1998 | A | FAIL |
Jim Sly
|
|
|
06/25/98 316 - Footing..Foot width,height,OK...Rained heavy not pouring. site.
|