INSP - Final | 6/25/1999 | 6/25/1999 | 6/25/1999 | P | PASS |
Russ Owen
|
|
|
06/25/99 407 - temp glass at master bath to be installed asap per contractor,has been covered now with osb untill replacement,also recommended a guard rail in writing to contracor,told him to advise owners,althoug the arae is out side of the Building code enforcement.
|
INSP - Final | 6/24/1999 | 6/24/1999 | 6/24/1999 | P | PART |
Russ Owen
|
|
|
06/24/99 407 - meet with Bob A ,in reguars to rear retaining wall. guard
|
INSP - Final | 6/22/1999 | 6/23/1999 | 6/23/1999 | A | FAIL |
Russ Owen
|
|
|
06/23/99 407 - Scheduled by Hello!. Contact phone is [8635808].
|
INSP - Concrete | 12/31/1998 | 12/31/1998 | 12/31/1998 | P | PASS |
Russ Owen
|
|
|
tennis court.
|
INSP - Framing/Rough-in | 12/30/1998 | 12/31/1998 | 12/31/1998 | P | CANC |
Russ Owen
|
|
|
12/31/98 407 - this is a foundation only.tennis court
|
INSP - Foundation | 12/29/1998 | 12/29/1998 | 12/29/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - TENNIS COURT WALL 1/2 OFI
|
INSP - Foundation | 12/28/1998 | 12/29/1998 | 12/29/1998 | A | PART |
Tom Arcoraci
|
|
|
12/29/98 408 - Scheduled by Hello!. Contact phone is [3457973].
|
INSP - Foundation | 12/21/1998 | 12/22/1998 | 12/21/1998 | A | FAIL |
Wes Worcester
|
|
|
12/22/98 342 - no one on street, two holes, one poured, one n/r, no plan
|
INSP - Framing/Rough-in | 10/29/1998 | 10/29/1998 | 10/29/1998 | A | PASS |
Russ Owen
|
|
|
did a day earleyer.. Contact phone is [8635808]. per 325
|
INSP - Framing/Rough-in | 10/28/1998 | 10/28/1998 | 10/28/1998 | P | CANC |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [8635808]. per 325
|
INSP - Framing/Rough-in | 10/22/1998 | 10/23/1998 | 10/23/1998 | A | PART |
Jim Storey
|
|
|
10/23/98 301 - Scheduled by Hello!. Contact phone is [3457973]. FRAM-OK FRAMING insulation ok pending engineering grage front, gurder conection great room celling and fire place flue fire stop penatration.
|
INSP - Framing/Rough-in | 10/19/1998 | 10/19/1998 | 10/20/1998 | P | PART |
Jim Storey
|
|
|
10/19/98 301 - greg ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to insulate ì
|
INSP - Wall cover | 10/15/1998 | 10/15/1998 | 10/15/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-insp straps added and hold downs as per engineers request
|
INSP - Wall cover | 10/5/1998 | 10/6/1998 | 10/6/1998 | A | PART |
Russ Owen
|
|
|
10/06/98 407 - need to add wall straps at the rear day light basement se
|
INSP - Wall cover | 9/15/1998 | 9/16/1998 | 9/16/1998 | A | FAIL |
Russ Owen
|
|
|
09/16/98 407 - Engineer needs to do site visit for corrections left with
|
INSP - Foundation | 6/24/1998 | 6/24/1998 | 6/24/1998 | A | PASS |
Russ Owen
|
|
|
Footings for a retaining wall at the exterior,which are attached to the building foundation.
|
INSP - Foundation | 6/22/1998 | 6/22/1998 | 6/23/1998 | P | PASS |
Russ Owen
|
|
|
06/22/98 407 - footings ok.
|