INSP - Framing/Rough-in | 7/7/1998 | 7/7/1998 | 7/7/1998 | P | FAIL |
Jim Sly
|
|
|
07/07/98 316 - ceiling inspection Need elect fixt tied and splay wires..
|
INSP-Sprinkler Rough-in/Hydro | 7/1/1998 | 7/2/1998 | 7/2/1998 | A | PART |
Joe Tawney
|
|
|
07/02/98 406 - brian 867=7612 OK ON SPKLR ROUGH IN
|
INSP-Sprinkler Rough-in/Hydro | 6/26/1998 | 6/29/1998 | 6/29/1998 | A | FAIL |
Joe Tawney
|
|
|
06/29/98 406 - brian/ ###-#### ROUGH IN FOR TI FAIL ALL HEADS NOT INSTALLED
|
INSP - Framing/Rough-in | 6/25/1998 | 6/26/1998 | 6/26/1998 | A | PASS |
Jim Sly
|
|
|
06/26/98 316 - Need mech insp (can insp at ceiling)..firest at floor, OK
|