INSP - Final | 5/4/1999 | 5/5/1999 | 5/6/1999 | A | PASS |
|
|
|
05/06/99 338 - madeok for l/c c/n removed
|
INSP - Final | 4/27/1999 | 4/29/1999 | 4/29/1999 | P | PASS |
|
|
|
04/29/99 338 - LCI-LETTER OF COMPLIANCE ISSUED # 16409
|
INSP-Final Inspection | 4/27/1999 | 4/29/1999 | 4/27/1999 | A | PART |
Rick Jackson
|
|
|
###-#### GIL//FIRE & LIFE SAFETY 4TH FLR QR and Standard heads used within same compartment
|
INSP - Final | 2/25/1999 | 2/25/1999 | 2/25/1999 | A | PART |
|
|
|
temp occ pending change of door hardware and side of hinge for cabo/ansi
|
INSP-Final Inspection | 2/24/1999 | 2/25/1999 | 2/25/1999 | A | PASS |
|
|
|
###-#### James
|
INSP - Final | 2/19/1999 | 2/22/1999 | 2/22/1999 | P | PART |
|
|
|
02/24/99 338 - james ###-#### 2/22/99 Call before going RES 02/22/99 Can phone call by James ###-#### RES
|
INSP-Final Inspection | 2/19/1999 | 2/22/1999 | 2/22/1999 | A | FAIL |
Joe Tawney
|
|
|
02/22/99 406 - james ###-#### FINAL FAIL SPKLR HEADS OVERSPACED. REVERSE EXIT DOOR SWING
|
INSP-Final Inspection | 9/1/1998 | 9/2/1998 | 9/2/1998 | A | FAIL |
Rick Jackson
|
|
|
joe ###-#### area for permit not complete - need strobe in conference room. sprinkler heads placed okay
|
INSP - Final | 9/1/1998 | 9/1/1998 | 9/1/1998 | P | PART |
|
|
|
09/01/98 333 - west side ok
|
INSP - Framing/Rough-in | 8/20/1998 | 8/21/1998 | 8/21/1998 | A | PASS |
|
|
|
08/21/98 333 - FRAME OK
|
INSP - Framing/Rough-in | 8/19/1998 | 8/20/1998 | 8/20/1998 | A | FAIL |
|
|
|
08/20/98 333 - covered befor inspection
|