INSP - Final | 8/28/1998 | 8/28/1998 | 8/28/1998 | | NR |
|
|
|
Need electrical sign-off and resubmittal of door change.
|
INSP-Final Inspection | 8/26/1998 | 8/28/1998 | 8/28/1998 | A | PASS |
Rick Jackson
|
|
|
FIRE AND SAFETY INSPECTION DON ###-#### occ approved
|
INSP - Final | 8/27/1998 | 8/27/1998 | 8/27/1998 | | CANC |
|
|
|
08/27/98 333 - canceled by Don
|
INSP - Final | 8/26/1998 | 8/27/1998 | 8/27/1998 | A | CANC |
|
|
|
08/27/98 333 - canceled by Don
|
INSP - Framing/Rough-in | 8/5/1998 | 8/5/1998 | 8/5/1998 | P | PASS |
|
|
|
08/05/98 333 - talked about ramps
|
INSP - Framing/Rough-in | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PART |
Jim Storey
|
|
|
07/21/98 301 - dON ###-#### FRAM-OK FRAMING c/n isued for submital from arch. of rorced brs.
|
INSP - Framing/Rough-in | 7/17/1998 | 7/20/1998 | 7/20/1998 | P | PART |
Jim Storey
|
|
|
07/20/98 301 - ###-#### don\Bronco Elite Gymnastics CORR-CORREC-CALL FOR REINSP WHEN COMPLETED recall for insp. of 2 hr wall nailling and door frame assemblys
|
INSP-Sprinkler Rough-in/Hydro | 7/16/1998 | 7/17/1998 | 7/17/1998 | A | PART |
Rick Jackson
|
|
|
don/ ###-#### conference on exit issues, signage and sprinklers
|