INSP - Final | 10/28/1998 | 10/29/1998 | 10/29/1998 | A | PASS |
Russ Owen
|
|
|
LC#17410.
|
INSP - Wall cover | 9/24/1998 | 9/24/1998 | 9/25/1998 | P | PASS |
Russ Owen
|
|
|
09/24/98 407 - DAVID ###-####
|
INSP - Energy code compliance | 9/22/1998 | 9/22/1998 | 9/22/1998 | P | PASS |
Russ Owen
|
|
|
09/22/98 407 - david ###-####
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - re-insp.
|
INSP - Framing/Rough-in | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | FAIL |
Russ Owen
|
|
|
09/21/98 407 - has corrections.
|
INSP - Wall cover | 8/11/1998 | 8/12/1998 | 8/13/1998 | A | PASS |
Russ Owen
|
|
|
08/12/98 407 - david ###-####
|
INSP - Wall cover | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | PASS |
Russ Owen
|
|
|
lower fire wall nailing.
|
INSP - Foundation | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PASS |
Russ Owen
|
|
|
FOOTING/ ###-#### POURING AT 10:30,note the front garage footing was pored before inspection and was incorrect,I had them correct also i had to wait for approved plans to be delivered, set back wrere not clearly indicated,had to determine with contractor.they are as per the approved plot plan. This unit has new engineering,which was not clear on plans I had a copy from the plan checker.
|