INSP - Final | 10/28/1998 | 10/29/1998 | 10/28/1998 | A | PASS |
|
|
|
10/29/98 338 - made ok for office to sign for 338
|
Permanent Occupancy | | 10/28/1998 | 10/28/1998 | | DONE |
|
|
|
|
INSP - Final | 10/13/1998 | 10/13/1998 | 10/13/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Sprinkler Rough-in/Hydro | 10/12/1998 | 10/13/1998 | 10/13/1998 | A | FAIL |
Joe Tawney
|
|
|
10/13/98 406 - ###-#### FOR FIRE INSP-NOT SURE WHO CAL-LINDA H TOOK INFO REINSP FAIL SMOKE DET DID NOT SHUT DOWN AHU
|
INSP - Final | 10/9/1998 | 10/12/1998 | 10/12/1998 | P | NR |
|
|
|
10/12/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | NR |
Joe Tawney
|
|
|
10/09/98 406 - bob ###-#### FINAL NOT READY
|
INSP-Sprinkler Rough-in/Hydro | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - SPKLR ROUGH IN OK EXC ADD ONE HEAD UNDER SOFFIT BY FRONT DOO
|
INSP - Framing/Rough-in | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PART |
|
|
|
10/06/98 338 - made k to drop in tiles c/n issued will check seizmic at
|
INSP - Framing/Rough-in | 9/28/1998 | 9/29/1998 | 9/29/1998 | A | PART |
|
|
|
09/29/98 338 - BOB ###-####
|
INSP - Framing/Rough-in | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | NH |
|
|
|
09/18/98 338 - BOB ALLEN ###-#### CONFERENCE
|
INSP - Conference | 9/2/1998 | 9/2/1998 | 9/2/1998 | | PART |
|
|
|
/ / 338 - WITH DEBBIS AT PERMIT EXPRESS 1-###-####
|