Permit Information
Permit NumberBLD98-01719
StatusFinaled
Name MIKE MARRS
Site Address 6013 E GATEWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
TO BUILD A 2685 SF TWO STORY SFD WITH AN UNFINISHED 1035 SF BASEMENT (1992 SF 1ST FL; 693 SF 2ND FL...3720 SF TOTAL) ;AN ATTACHED 693 SF THREE BAY GARAGE AND CONCRETE PATIO PER APPROVED PLANS AND ATTACHED ENGINEERING. ACHD# 98-1767 PC# 468. 340CD.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final11/13/199811/13/199811/13/1998PPASS
DetailsRuss Owen
LC#17403.
INSP - Final11/10/199811/12/199811/12/1998AFAIL
DetailsRuss Owen
Scheduled by Hello!. Contact phone is [8666175].
INSP - Energy code compliance9/14/19989/15/19989/15/1998APASS
DetailsRuss Owen
09/15/98 407 - Scheduled by Hello!. Contact phone is [8666175].
INSP - Framing/Rough-in9/15/19989/15/19989/15/1998 PASS
DetailsRuss Owen
/ / 407 - re-insp.
INSP - Framing/Rough-in9/15/19989/15/19989/15/1998 PASS
DetailsRuss Owen
/ / 407 - re-insp.
INSP - Framing/Rough-in9/10/19989/11/19989/11/1998AFAIL
DetailsRuss Owen
09/11/98 407 - left corrections posted .
INSP - Framing/Rough-in8/24/19988/25/19988/25/1998APASS
DetailsRuss Owen
08/25/98 407 - OK TO INSTALL FINISHED SIDING.
INSP - Foundation6/26/19986/29/19986/29/1998PFAIL
DetailsRuss Owen
06/29/98 407 - foundation walls have been poured before the inspection.
INSP - Footings6/25/19986/25/19986/25/1998 PART
DetailsRuss Owen
/ / 407 - footings,as per plan at the site also set backs,early start approved no approved plans at this time.