INSP-Final Inspection | 8/3/1998 | 8/3/1998 | 8/3/1998 | P | PASS |
Joe Tawney
|
|
|
08/03/98 406 - SARAH ###-#### FINAL OK FOR CERT OF COMPLETION
|
INSP - Final | 7/30/1998 | 7/31/1998 | 7/31/1998 | A | NR |
Tom Arcoraci
|
|
|
07/31/98 408 - SARAH ###-#### WON'T BE OPEN TIL TIL 9 OR 10
|
INSP - Framing/Rough-in | 7/1/1998 | 7/2/1998 | 7/2/1998 | A | PASS |
Carl Dependahl
|
|
|
conf w/ bldr; frame ok.
|
INSP - Framing/Rough-in | 7/1/1998 | 7/2/1998 | 7/2/1998 | P | CANC |
Wes Worcester
|
|
|
07/02/98 342 - dave/ ###-#### called on way out....said it was already
|
INSP - Framing/Rough-in | 7/1/1998 | 7/1/1998 | 7/2/1998 | P | PART |
Carl Dependahl
|
|
|
complete top of wall detail; ok to cover
|
INSP - Framing/Rough-in | 7/1/1998 | 7/1/1998 | 7/1/1998 | A | NR |
Carl Dependahl
|
|
|
conf only; rec'd memo from fire dept..."no permit"...but permit is issued.
|
INSP - Framing/Rough-in | 6/30/1998 | 6/30/1998 | 6/30/1998 | P | NR |
Carl Dependahl
|
|
|
Dave 34408182...no plans, met w/ owner, told to recall. no elec.
|