INSP - Final | 11/13/1998 | 11/13/1998 | 11/13/1998 | P | PASS |
|
|
|
11/13/98 333 - FNL -OK FINAL
|
INSP - Final | 11/12/1998 | 11/12/1998 | 11/13/1998 | P | FAIL |
|
|
|
11/12/98 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Energy code compliance | 9/4/1998 | 9/4/1998 | 9/4/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 9/3/1998 | 9/4/1998 | 9/4/1998 | A | PASS |
Jim Sly
|
|
|
09/04/98 316 - ERIC ###-#### ì
|
INSP - Framing/Rough-in | 9/3/1998 | 9/3/1998 | 9/3/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Point loads...
|
INSP - Framing/Rough-in | 9/3/1998 | 9/3/1998 | 9/3/1998 | | FAIL |
Jim Sly
|
|
|
09/03/98 316 - Need Mech and Plumb....
|
INSP - Framing/Rough-in | 8/31/1998 | 8/31/1998 | 8/31/1998 | | NR |
Jim Sly
|
|
|
08/31/98 316 - NR
|
INSP - Framing/Rough-in | 8/31/1998 | 8/31/1998 | 8/31/1998 | P | PASS |
Jim Sly
|
|
|
Shear wall OK
|
INSP - Framing/Rough-in | 8/31/1998 | 8/31/1998 | 8/31/1998 | | PASS |
Jim Storey
|
|
|
08/28/98 301 - sheer wall eric ###-#### hold downs per engineering ok bach wall.
|
INSP - Framing/Rough-in | 8/21/1998 | 8/21/1998 | 8/21/1998 | P | PART |
Jim Sly
|
|
|
08/21/98 316 - shear wall...OK to side all except Rear wall..working on
|
INSP - Framing/Rough-in | 8/14/1998 | 8/14/1998 | 8/14/1998 | P | FAIL |
Jim Sly
|
|
|
08/14/98 316 - shear wall C/N..Eng to provide fix for misplaced HDs...Ne
|
INSP - Foundation | 7/15/1998 | 7/15/1998 | 7/15/1998 | P | FAIL |
Tom Arcoraci
|
|
|
07/15/98 408 - footing/ ###-#### POURED WITHOUT INSPECTION
|