INSP - Final | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | PASS |
Wes Worcester
|
|
|
04/13/99 342 - Jeff ###-####
|
INSP - Final | 2/18/1999 | 2/19/1999 | 2/19/1999 | A | NR |
Jim Storey
|
|
|
02/19/99 301 - ###-#### Jeff c/n safety glazing at the entrys
|
INSP - Final | 2/17/1999 | 2/18/1999 | 2/18/1999 | A | FAIL |
|
|
|
02/18/99 338 - c/n issued safety glazing at the entry door area
|
INSP - Energy code compliance | 11/17/1998 | 11/16/1998 | 11/16/1998 | P | PASS |
Bob Archibald
|
|
|
|
INSP - Framing/Rough-in | 11/17/1998 | 11/16/1998 | 11/16/1998 | P | PART |
Bob Archibald
|
|
|
CN issued for stair rise. Will verify at final
|
INSP - Foundation | 8/14/1998 | 8/14/1998 | 8/14/1998 | | PASS |
|
|
|
Made OK
|
INSP - Foundation | 8/13/1998 | 8/13/1998 | 8/13/1998 | | FAIL |
|
|
|
Placed w/out inspection: setbacks, soil and footing size appear ok. Reinforcing observed 08/12/98.
|
INSP - Concrete | 8/12/1998 | 8/12/1998 | 8/12/1998 | | PEND |
|
|
|
Reviewed approved plans and engineering. Contractor will call for reinspection when ready.
|
INSP - Foundation | 8/11/1998 | 8/11/1998 | 8/11/1998 | P | FAIL |
Wes Worcester
|
|
|
on fill with organic matter exposed at retained grade beam excavation
|