BLD-Final | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PASS |
Tom Arcoraci
|
|
|
don ###-####
|
FIRE-Final Inspection | 9/30/1999 | 10/1/1999 | 9/30/1999 | A | PASS |
Rick Jackson
|
|
|
Don ###-#### Occupancy approved
|
FIRE-Hydro test above ground | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | PART |
Joe Tawney
|
|
|
Doug ###-#### Ok on above ground hydro test
|
INSP - Framing/Rough-in | 8/18/1999 | 8/18/1999 | 8/18/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/18/99 340 - don-- ###-#### fr--insp; need truss eng'g, draftstops, fi
|
INSP-Conference | 5/11/1999 | 5/11/1999 | 5/11/1999 | | PART |
|
|
|
CONF W/MIKE ON CURB STRIPING
|
INSP - Framing/Rough-in | 10/29/1998 | 10/29/1998 | 10/29/1998 | | PART |
|
|
|
10/28/98 338 - roof and shear nailing insp at ext corners
|
INSP - Foundation | 9/11/1998 | 9/14/1998 | 9/13/1998 | A | PART |
|
|
|
09/14/98 338 - MADE OK FOEWALLS
|
INSP - Foundation | 8/28/1998 | 8/28/1998 | 8/28/1998 | P | PASS |
|
|
|
made ok to pour with the sp insp blessing r-bar placed ground electrode placed
|
INSP - Foundation | 8/28/1998 | 8/28/1998 | 8/28/1998 | | PART |
|
|
|
08/28/98 338 - made k to pour the west and north footings as the r-bar i
|