INSP - Final | 4/1/1999 | 4/2/1999 | 4/2/1999 | A | PASS |
Jim Sly
|
|
|
04/02/99 316 - C/C # 13107
|
INSP - Final | 3/30/1999 | 3/31/1999 | 3/31/1999 | P | FAIL |
Jim Sly
|
|
|
03/31/99 316 - C/N..Handrails, drainage,prot post., landing....
|
INSP - Final | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | FAIL |
Tom Arcoraci
|
|
|
03/30/99 408 - kevin ###-####
|
INSP - Framing/Rough-in | 11/19/1998 | 11/20/1998 | 11/20/1998 | P | PASS |
Jim Sly
|
|
|
11/20/98 316 -
|
INSP - Framing/Rough-in | 11/18/1998 | 11/19/1998 | 11/19/1998 | A | FAIL |
Jim Sly
|
|
|
11/19/98 316 - Kevin, ###-#### : ) C/N.....Too many Corr to list.
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | PART |
Jim Sly
|
|
|
10/20/98 316 - shear wall OK
|
INSP - Foundation | 9/8/1998 | 9/8/1998 | 9/8/1998 | P | FAIL |
Jim Sly
|
|
|
09/08/98 316 - Moved rear found to allow Id Power ease..Foot width,heigh
|
INSP - Foundation | 9/3/1998 | 9/4/1998 | 9/4/1998 | A | FAIL |
Jim Sly
|
|
|
09/04/98 316 - Repour to allow easment..Foot width,soil,dowels,height OK
|
INSP - Foundation | 7/29/1998 | 7/30/1998 | 7/30/1998 | A | FAIL |
Jim Sly
|
|
|
07/30/98 316 - Foot width, height, soil OK...Setbs appear OK..No appr pl
|