INSP - Final | 5/18/1999 | 5/19/1999 | 5/19/1999 | A | PASS |
Jim Sly
|
|
|
05/19/99 316 - C/C # 16162
|
INSP - Energy code compliance | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Energy code compliance | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | FAIL |
Jim Sly
|
|
|
10/06/98 316 - NR
|
INSP - Framing/Rough-in | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PASS |
Jim Sly
|
|
|
10/06/98 316 - brian ###-####
|
INSP - Framing/Rough-in | 10/1/1998 | 10/5/1998 | 10/5/1998 | A | FAIL |
Jim Sly
|
|
|
10/05/98 316 - C/N...Misc fireblk, pointloads, truss brace, ......
|
INSP - Framing/Rough-in | 9/23/1998 | 9/24/1998 | 9/24/1998 | A | PART |
Jim Sly
|
|
|
09/24/98 316 - SHEAR NAIL OK ENGINEERING DOCUMENTS For lags vs bolts
|
INSP - Framing/Rough-in | 9/21/1998 | 9/22/1998 | 9/22/1998 | A | FAIL |
Jim Sly
|
|
|
09/22/98 316 - C/N...Engineer to OK lags in HDs
|
INSP - Foundation | 8/11/1998 | 8/11/1998 | 8/11/1998 | P | FAIL |
Jim Sly
|
|
|
###-#### jerry footing Poured W/O...No appr plan.
|