INSP - Final | 2/23/1999 | 2/23/1999 | 2/23/1999 | P | PASS |
Bob Archibald
|
|
|
Scheduled by Hello!.Issued LC #17606.
|
INSP - Final | 2/19/1999 | 2/19/1999 | 2/19/1999 | P | FAIL |
Russ Owen
|
|
|
02/19/99 407 - left corrections.........
|
INSP - Framing/Rough-in | 1/7/1999 | 1/8/1999 | 1/8/1999 | A | PASS |
Russ Owen
|
|
|
01/08/99 407 - DENISE ###-####
|
INSP - Energy code compliance | 1/4/1999 | 1/5/1999 | 1/6/1999 | A | FAIL |
Russ Owen
|
|
|
01/06/99 407 - has corrections left.
|
INSP - Framing/Rough-in | 12/30/1998 | 12/30/1998 | 12/30/1998 | P | FAIL |
Russ Owen
|
|
|
12/30/98 407 - Scheduled by Hello!. Contact phone is [3857310].
|
INSP - Framing/Rough-in | 12/8/1998 | 12/8/1998 | 12/8/1998 | P | PART |
Russ Owen
|
|
|
12/08/98 407 - MEET WITH CONTRACTOR, ENGINEERING WAS ONLY REQUIRED AT FR
|
INSP - Framing/Rough-in | 12/2/1998 | 12/2/1998 | 12/2/1998 | P | FAIL |
Russ Owen
|
|
|
12/02/98 407 - sidded before inspection,left note to recall with approve
|
INSP - Foundation | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | PART |
Russ Owen
|
|
|
08/06/98 407 - exterior footings ok,set backs appear ok,early start perm plans at this time.
|