INSP - Final | 5/7/1999 | 5/10/1999 | 5/10/1999 | A | PASS |
Wes Worcester
|
|
|
05/10/99 342 - Jerry ###-####
|
INSP-Final Inspection | 5/7/1999 | 5/10/1999 | 5/10/1999 | A | PASS |
Joe Tawney
|
|
|
05/10/99 406 - REINSP OK FOR PERM OCC
|
Permanent Occupancy | | 5/10/1999 | 5/10/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | FAIL |
Joe Tawney
|
|
|
05/07/99 406 - FINAL FAIL DOOR HDWRE, RR SIGN
|
INSP-Final Inspection | 5/6/1999 | 5/6/1999 | 5/7/1999 | P | FAIL |
Wes Worcester
|
|
|
05/06/99 342 - need fire inspection
|
INSP - Final | 5/6/1999 | 5/6/1999 | 5/6/1999 | P | FAIL |
Carl Dependahl
|
|
|
05/06/99 340 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Wall cover | 4/12/1999 | 4/12/1999 | 4/12/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF ONLY, REFERRED TO PUB WKS.
|
INSP - Framing/Rough-in | 4/5/1999 | 4/5/1999 | 4/5/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF ONLY W/ JERRY, SUPT RE FINALS
|
INSP - Framing/Rough-in | 3/30/1999 | 3/30/1999 | 3/30/1999 | P | PASS |
Wes Worcester
|
|
|
03/30/99 342 - ###-#### gerry econo lube
|
INSP - Framing/Rough-in | 3/17/1999 | 3/17/1999 | 3/17/1999 | P | PART |
Carl Dependahl
|
|
|
03/17/99 340 - jerry ###-#### deck nailing ispection 342 area, roof deck & wall ties ok to cover
|
INSP - Framing/Rough-in | 3/16/1999 | 3/17/1999 | 3/17/1999 | A | FAIL |
Wes Worcester
|
|
|
03/17/99 342 - ROOF DECK NAILING JERRY ###-#### no one on site
|
INSP - Framing/Rough-in | 2/24/1999 | 2/25/1999 | 2/25/1999 | A | PART |
Carl Dependahl
|
|
|
02/25/99 340 - grouting masonry, pend spec insp report.
|
INSP - Framing/Rough-in | 1/20/1999 | 1/21/1999 | 1/21/1999 | A | PART |
Carl Dependahl
|
|
|
01/21/99 340 - JERRY ###-#### WILL POUR AT 10:00. witnessed spec ins bar in place, weld test to be done for nw corner lintel, etc. pending re
|
INSP - Foundation | 1/14/1999 | 1/14/1999 | 1/14/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - fnd walls, pending spec insp report. looks ok.
|
INSP - Foundation | 1/11/1999 | 1/12/1999 | 1/12/1999 | P | PART |
Carl Dependahl
|
|
|
01/12/99 340 - POURING AT 1:00---JERRY ###-####...part, ext ftgs,pen
|
INSP - Concrete | 1/4/1999 | 1/4/1999 | 1/4/1999 | A | PART |
Carl Dependahl
|
|
|
conf only; requested spec insp reports, supt. will follow up.
|
INSP - Concrete | 12/30/1998 | 12/30/1998 | 12/30/1998 | P | PART |
Carl Dependahl
|
|
|
membrane at pit floor; bituthene installed
|
INSP - Concrete | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Carl Dependahl
|
|
|
"pit" walls...pending spec insp report.
|
INSP - Foundation | 12/15/1998 | 12/15/1998 | 12/15/1998 | P | PART |
Carl Dependahl
|
|
|
pending spec insp report.
|
INSP - Framing/Rough-in | 12/11/1998 | 12/14/1998 | 12/14/1998 | A | FAIL |
Carl Dependahl
|
|
|
gerry ###-#### cell -walls insp-ordered slump test not frame insp....no plans onsite...left card
|
INSP - Concrete | 12/8/1998 | 12/8/1998 | 12/8/1998 | P | FAIL |
Carl Dependahl
|
|
|
supt. not onsite...ftgs pending spec insp reports.
|
INSP - Foundation | 11/30/1998 | 12/1/1998 | 12/1/1998 | A | PART |
Russ Owen
|
|
|
12/01/98 407 - FOOTING AT SLAB FOR LUBE PIT. CONTRACTOR TO PLACE VERTICA
|
INSP - Foundation | 12/1/1998 | 12/1/1998 | 12/1/1998 | P | PART |
Carl Dependahl
|
|
|
econo lube; pending spec insp reports, told concrete contractor to have city plans onsite for insp's
|
INSP - Foundation | 11/30/1998 | 11/30/1998 | 11/30/1998 | P | CANC |
Carl Dependahl
|
|
|
WILL RESCHEDULE
|
INSP - Concrete | 11/23/1998 | 11/23/1998 | 11/23/1998 | P | PART |
Carl Dependahl
|
|
|
JERRY WIGGINS 3:00 PM ###-#### ECONO LUBE; PRE-CON CONF. pre-con conference; requested spec inspection/compaction reports...explained insp. process, etc. Not ready to pour
|