BLD-Final | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | PASS |
Carl Dependahl
|
|
|
DAVE-- ###-#### FN INSP C/N ok
|
BLD-Final | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | FAIL |
Carl Dependahl
|
|
|
DAVE ###-#### Struct ok, need HTG. Final.
|
FIRE-Final Inspection | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | PASS |
Joe Tawney
|
|
|
DAVE ###-#### Reinsp. Ok for cert. Of compl.
|
BLD-Final | 11/5/1999 | 11/8/1999 | 11/8/1999 | P | FAIL |
Carl Dependahl
|
|
|
DAVE ###-#### C/N landing, handrail, etc.
|
FIRE-Final Inspection | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | FAIL |
Joe Tawney
|
|
|
DAVE ###-#### Final fail C/N issued
|
INSP - Framing/ Rough-in | 8/13/1999 | 8/13/1999 | 8/13/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - RESEARCHED INSP RECORDS & PERMIT...NO INSP PERFORMED
|
INSP - Framing/Rough-in | 4/8/1999 | 4/9/1999 | 4/9/1999 | A | PASS |
Wes Worcester
|
|
|
04/09/99 342 - 04/09/99 342 - ###-#### DWAYNE//CEILING GRID
|
INSP - Framing/Rough-in | 3/23/1999 | 3/18/1999 | 3/18/1999 | A | PART |
Carl Dependahl
|
|
|
conf w/ owner re tunnel const
|