INSP - Framing/ Rough-in | 8/13/1999 | 8/13/1999 | 8/13/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ OWNER, NEED PERMIT FOR ADD'L T/I PACKAGE FOR C/O
|
INSP - Framing/Rough-in | 8/12/1999 | 8/13/1999 | 8/13/1999 | A | FAIL |
Wes Worcester
|
|
|
08/13/99 342 - DAVE ###-#### needs ti improvement permit
|
INSP - Framing/Rough-in | 3/10/1999 | 3/10/1999 | 3/11/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/10/99 340 - per-4068 DAVE//FRAMING RI nr, not wired
|
INSP - Framing/Rough-in | 3/9/1999 | 3/9/1999 | 3/9/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/09/99 340 - DAVE ###-#### nr, need elec
|
INSP-Conference | 11/13/1998 | 11/13/1998 | 11/13/1998 | A | CONF |
Mike Kinnear
|
|
|
Owner and FS Contractor requested info for temporary occupancy for shell (BLD98-2400) and tenant All Pro Floors permit in regards to finish sprinkers on this permit. Informed them that it would have to be NFPA #13 fully sprinklered/inspected and not capped off for future tenant.
|